1)pile is of 200mm dia.-- a)tell the cutting length of ring
considering 2cm cover b) tell the quantity of concrete
considering pile length as 3m c) tell concrete quantity in
bulb
Answer Posted / srinivas.maradana
1)The 200 pile reinforcement cuuting lengtg 050mtr with
lap060 mtr
2)the qty is 00942 for 3 mtrs
| Is This Answer Correct ? | 1 Yes | 4 No |
Post New Answer View All Answers
from where ican get sample papers for CET-delhi 2012
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
What is the effect of a building collapse?
what do you understand by M25 concrete
What are the types of slump?
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
Wat is meant by Aecron brick?
What is rate of concrete surface rendering work per sqm
what is moment-curvature relationship in semi rigid connections??
what is kribs is supporting?
what is the mode of method of face bar measurement
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
what are the changes in concrete pour height as per IS 456, 2009?