width rangs in NH,SH in one-way lane &two-way lane why we
are provid caber is there any reson for that
Answer / ashish thakur
NH-one way lane=7m to 8m.
NH=two way lane 15m to18m.
same for SH
camber to beused as flow the water from road embackment.
Is This Answer Correct ? | 0 Yes | 0 No |
how much quantity are required like cement,sand,aggregate for (46*29*0.41)feet slab? how much this quantity can be calculated?
all rod lapping formula
how do i remedy a foundatiom that the column bases was cast and aftet 28days crushing the conprehensive strength of the concrete fall below the specification 25N/mm2
what is the problem not getting 7 days slab cycle in Mivan formwork? what is the output of mivan carpenter per day?
What's is mean by survey
In few lines, please be elaborative on extras and talents that make you a potential candidate for the post:
Hi my name is Binyam and I'm a 7th grader at Mayfield Woods Middle school. I decided to research civil engineering as my career and i need to know a few thing about your profession. What is your daily routine? What are some advantages and things you like about your job? What are some disadvantages What is the hardest thing you have done? What education have you gone through to become a civil engineer? How long is your work day? What is your work environment like? What is your salary? What made you want to become an engineer? What tools do you you use? Thank you for answering my questions
0 Answers State Bank Of India SBI,
what is the density of concrete & steel? where we are using pycnometer? what is bulking of sand? what is under reinforced & over reinforced? what is balanced section?
How many steel is require in one sqft area?
17 Answers L&T, XYZ,
How many square meter can mason layout chb per hour
i want to know the easy way to find the quantity of steel in a slab , coloumn
How can i design the beam . Explain with one example