1)pile is of 200mm dia.-- a)tell the cutting length of ring
considering 2cm cover b) tell the quantity of concrete
considering pile length as 3m c) tell concrete quantity in
bulb
Post New Answer View All Answers
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)
material used for mendrel use to bend epoxy coated rebar
How to avoid fly ash seed ball formations in the concrete mixer while mixing of raw materials for fly ash block manufacturing?
What year was the keystone power plant in Indiana County constructed?
How do you measure water flowing through 300mm diameter pipes?
where i can get material costs on weekly basis
What is Gsb tollens ?
how to calculate testing date
Who designed the city of washington dc?
in staad pro. modelling for a parallel scissors chord truss, when i assigned roller support i.e fixwd but with all Fx, FZ, Mx, My and Mz release except Fy... the analysis results " in stability at a joint, with direction Mx or My..what could be the reason...anyone please explaing
WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.
please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)
what is mean by c32/40s concrete class
what is cement wastage percentage in NHAI ROAD WORKS
How to find beam R/F cutting length