1)pile is of 200mm dia.-- a)tell the cutting length of ring
considering 2cm cover b) tell the quantity of concrete
considering pile length as 3m c) tell concrete quantity in
bulb
Answer Posted / rohit
Mr. Srinivas,
Can u tell the calculation formula.
Regards,
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
how to design and calculate materail quantity for concrete speedbreaker ?
hai, kindly send anyone for output workers format details for construction project in foundation to finishing.
In case if concrete box girder bridges how is the number of cells determined?
how to preaper for interview wat they asked in interview give me idea
what is shuttering co efficient?
pls give me ans to ACT formula cube testing porpuse
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????
What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?
States some of the tool bars used in cad?
What do you meant by gui?
How to use of me trial wall plaster 6mm , 10mm par sqm. use in sand and cement ?
may i know the detailed description of cutting length
how to calculate MR 9(derivation)
Define What is an ice dam sock?
Detection of a beam & a girder areββββ