what quantities of work done in terms of sq.mts/day/ of
8hrs for each varpenter (shuttering) and Steel fitter in
terms of Tonnes. For slabs, Columns etc.?
No Answer is Posted For this Question
Be the First to Post Answer
why do we provide haunch for drains and culverts?
what values & beliefs have guided you in your career path
Brick is fire resistant than stone because––
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
Which apparatus done steel (bar) tension test
the amount of gypsum usuallyin the manufacture of cement
List out some of the software program that can be useful for architect?
How much percent dry volume consider for concrete
A building wall is to be constructed , its 12 ft high and 40 ft long and labour cost per foot is 100 rupees , tell me the total cost of labour for that building work plz explain answer ..I am hurry plz any one give me ans as immediately as possible Thanx
3,6,13,26,33,66,____
How to compute minimum number of columns required for a site from area of site?
what is BPM in concrete demolition hammers. what is better a higher value or lower
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)