what quantities of work done in terms of sq.mts/day/ of
8hrs for each varpenter (shuttering) and Steel fitter in
terms of Tonnes. For slabs, Columns etc.?
No Answer is Posted For this Question
Be the First to Post Answer
Why do we use steel in Column? Why HYSD bar is preferable than plain bar?
in M20 Mix concrete how much cement, sand and 20mm metal?
though u r a civil engineer, y r u interested in tcs???
0 Answers TCS, URC Construction,
diffrence between mjb & mnb
How to calculate the dia of reinforcement when required (as per drawing) dia of reinforcement steel not available at site?
3 Answers MNC, N J Devani Builders, Simplex,
What the advantages and disadvantage of using 90mm and 100mm bricks for a wall of a house? Thanks for any input.
If a 12m main road straight is adjoined from both sides by 7.5 m road , how curves are given at corner for vehicle movement (measurement pls.)?
Please i want to know how to find column main bar cat of length
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing
if cement is 70 kg. sand is 140 kg and coarse aggregate is 280 kg. so what is volume of cement, sand and coarse aggregate? please explane it.
1)How to calculate concrete cube testing load by area in mpa 2) in kg/cme also
How Much span required for 1 sqm of shuttering(Beam & Slab)