How much steel required in 1 square feet slab?
Answers were Sorted based on User's Feedback
Answer / pramansrivastava
.75 kg to 1.1 kg steel required for 1sqft slab.
Is This Answer Correct ? | 138 Yes | 22 No |
Answer / sudhir patil
its totally depend on the design of that perticular
structure.Normally its seen that G + 7 structure is having
2.8 to 4 kg per Sft & High rise building having 9 to 12 kg
per sft.
Is This Answer Correct ? | 48 Yes | 15 No |
Answer / babar
It is only depend that which dia of bar in slab is being used
Is This Answer Correct ? | 19 Yes | 3 No |
Answer / karthick
it is depended upon the structural design but normally for a nominal slab with single floor it is 1.3 to 1.5 kg of steel is used
Is This Answer Correct ? | 20 Yes | 7 No |
In multistory building
----------------------
1- Raft + Retaining wall (In case basement)--- 8kg/sqft
2- basement roof slab i/c non tower slab,
( Column from basement floor to stilt floor + basement roof
slab slab)-- 6.5kg/sft
3 - typical floor / for each floor ___ 4.5kg/sft
Is This Answer Correct ? | 17 Yes | 7 No |
Answer / waseem khattak
you can only assume or can calculate from structure drawing
normaly 30 ton steel required for 1 kanal plot with basement
and rcc wall
Is This Answer Correct ? | 3 Yes | 5 No |
Answer / faizan
i think the 1 sq fit area is consume of 1.5 to 2 kg/sq fit
Is This Answer Correct ? | 5 Yes | 7 No |
how to remove the quantity of metal 1 and metal 2 in concrete
why the compressive strength of concrete is calculated only after 28 days.why not after 25, 26,27 days..
why we are useing plastic under the lean concrete?and whts the advantage?
What is the difference between stress and pressure
what is the ideal construction joint for slab?
how many area req.in 15000liter water tank
What is the cement consumption for waterproofing for residential building in sft?
what is the tensile strength of 10swg and 8swg gabion wire?
How to calculate the cement and fine aggregate requirement for solid block masonry works in terms of Sqm. 1. 400x200x200mm 2. 400x200x100mm 3. 600x200x100mm 4. 600x200x200mm I need the answer for 1 Sqm of solid block works.
why don't we need shear reinforcement in slabs?
how to find steel quantity
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.