A IS TWICE AS GOOD A WORKMAN AS B AND TOGETHER THEY FINISH A
PIECE OF WORK IN 14 DAYS.THE NUMBER OF DAYS TAKEN BY A ALONE
TO FINISH THE WORK IS
1.11 2.21 3.28 4.42
Answers were Sorted based on User's Feedback
Answer / k.prakashchandra
This problem can be solved using fractions also.Work done in
one day is 1/14. Out of this, A' contribution is 2/3and of B
itis 1/3.So A does 1/14 x 2/3 i.e. 2/42 of the work and B
1/42.Hence A alone takes 21 days to complete the work ,and B
42 days.
| Is This Answer Correct ? | 19 Yes | 4 No |
Answer / k.prakashchandra
Take 2 men for A. Then 3:14 :: 2 : ? ,14 x 3/2= 21 days
| Is This Answer Correct ? | 17 Yes | 4 No |
define ac reactor? thier application;
How many kinds of E.L.C.B and how to work E.L.C.B
What are the disadvantages of LT AVR over HT AVR?
1 Answers APTransco, Jindal, TNEB Tamil Nadu Electricity Board,
how much cable size required for 70 kilowatt load.
why reactive power control is required
We are preparing another project which involves Waste heat recovery from a 1 MW GE Engine. The Engine in particular gives out flue gas at 487Deg C with a flow rate of 5650 kg/hour and this can be cooled to 180 Deg C. This gives a thermal output of ~ 594 KW that is available for input to VAM via heat exchanger / boiler. Additionally 581 KW will be available from engine jacket water (temperature profile 80/ 80 Deg C and a flow rate of 50m3/hr) Our estimation is that 300 TR of cooling is possible with a suitable VAM machine(s). Please advise what is the most suitable arrangement with maximum TR and min Capital expenditure. plz reply me as early as possible
In case of HV test on medium voltage cables, BS is asking for 4 U0 where as IEC is asking for 3.5 U0. Can any one advise me how this 3.5 times or 4 times U0 is derived?
I have iti elec, 1st aid, and 5 yrs experience in 7.5 mw power plant. Am i eligeble for 11kv license in telangana state..when, how to apply for that.?
difference b/w timer and counter
Why we use shunt coil in breaker??????????
No load tap changing transformer working
Office , overtime and television how big this stage?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)