Answer / k.prakashchandra
This problem can be solved using fractions also.Work done in
one day is 1/14. Out of this, A' contribution is 2/3and of B
itis 1/3.So A does 1/14 x 2/3 i.e. 2/42 of the work and B
1/42.Hence A alone takes 21 days to complete the work ,and B
42 days.
| Is This Answer Correct ? | 19 Yes | 4 No |
Answer / k.prakashchandra
Take 2 men for A. Then 3:14 :: 2 : ? ,14 x 3/2= 21 days
| Is This Answer Correct ? | 17 Yes | 4 No |
What will happen if induction motor is supplied with capacitive load?
What is the difference between Rectifier & Converter?
why transformers are put with supply for 24 hours before giving supplying to a locality?
what is mean by PIR in circuitbreaker and give me detail of that?
How transformer winding & oil gets heat.
What is the inside of ACB & VCB & SF6 breaker's pls tell me about this
how a synchronous motor is used as a resistor,capacitor and an inductor?
what is the minimum voltage require to injure our body?
what happened if power factor is "1"
what is mean by single phasing used for electrification in rural area of maharashtra ?
opkinson's test
working of bucholz relay of a transformer
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)