A IS TWICE AS GOOD A WORKMAN AS B AND TOGETHER THEY FINISH A
PIECE OF WORK IN 14 DAYS.THE NUMBER OF DAYS TAKEN BY A ALONE
TO FINISH THE WORK IS
1.11 2.21 3.28 4.42
Answer Posted / vaibhav kumar
28
| Is This Answer Correct ? | 8 Yes | 18 No |
Post New Answer View All Answers
List the disadvantages of constant k filters?
Electronic circuit
Which motor connection is preferable star-delta or delta-star?
What is the difference between a Root Locus plot and a Bode plot?
What is Diff btw Fire Alarm & VESDA System???
earth also having a gravitational force (magnetic field of north and south)but it attracts any object compare to this theartifical magnetic cant perform same as earth why?
When we use air circuit breaker, it has O/L protection ,time delay SC protection, Instataneous SC protection & ground fault protection. They all have some setting range. But what is the suitable/allowable setting for the above protection which will be safe for the equipment? For example-O/L protection setting have a range of (0.4,0.45,0.5,0.55,0.6,0.65,0.7,0.8,0.9,1.0)xIn Time delay SC protection have a range of (1.25,1.5,2,3,4,6,8,10,12)xIn Time delay setting is 0.02,0.1,0.2,0.3,0.4 Instataneous setting is fixed to 20xIn Gound fault setting is given 100A,300A,600A,900A,1200A This setting are for 2500A ACB. So what will be the basic allowable setting for the above protection? is there any formulae to calculate this<
what is the maximum temperature rating of a thhn insulated conductor?
Define active filter?
Why choke coil is connected in series with starter in tubelight??why starter is connected in parallel to tubelight??
In radial network the source is fed from 1 end both ends at central
what is the meaning of impedance protected in instrument cooling fan
what is the concept of directional power?
and gate circuit diagram,amplifier circuit diagram
how to calculate the tarriff for an industry whose kva demand is 10 mva