A IS TWICE AS GOOD A WORKMAN AS B AND TOGETHER THEY FINISH A
PIECE OF WORK IN 14 DAYS.THE NUMBER OF DAYS TAKEN BY A ALONE
TO FINISH THE WORK IS
1.11 2.21 3.28 4.42
Answer Posted / k.prakashchandra
This problem can be solved using fractions also.Work done in
one day is 1/14. Out of this, A' contribution is 2/3and of B
itis 1/3.So A does 1/14 x 2/3 i.e. 2/42 of the work and B
1/42.Hence A alone takes 21 days to complete the work ,and B
42 days.
| Is This Answer Correct ? | 19 Yes | 4 No |
Post New Answer View All Answers
700KW 6.6KV slip ring induction motor to use VFD to control the speed
Can any one know what are the symbols at the down (below) the analog ammeter??? there are 4 symbols which are they ?????
How to calculate cable size in HT AND LT
Currently what is the highest capacity (MVA) of SPPg generator available in the market?
How to discuss the phase shift of transformer considering open delta?
How to decide no. of Step and Kvar for APFC Panel 40 kvar MD: 33.12 KVA Avg pf : 0.8540
regarding safety what would u consider the most important rules to observe when inspecting electrical equipment?
How eddy current generation support the idea of train braking?
what is the common earth
What is lighting kitts.
What is the working mechanism of OLTC in Power Transformers????
What is kirchoff ’s current law (kcl)?
Is the theorem applicable to ac sources?
Why Water motor is not taking a load or pressure while everything is correct. (Note: Motor running properly)
How efficiency of thermal plant can be improved?