A IS TWICE AS GOOD A WORKMAN AS B AND TOGETHER THEY FINISH A
PIECE OF WORK IN 14 DAYS.THE NUMBER OF DAYS TAKEN BY A ALONE
TO FINISH THE WORK IS
1.11 2.21 3.28 4.42

Answer Posted / k.prakashchandra

Take 2 men for A. Then 3:14 :: 2 : ? ,14 x 3/2= 21 days

Is This Answer Correct ?    17 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is mathed of check the D.C MOTOR 181 KW (ARMATURE AND FIELD) WHAT IS THE MATHED OF CHECK THE THYRISTOR MODULE (HIGH CURRENT)

1660


explain the Trip supervision circuit

1742


Scott connection is used for A 3-phase to 2-phase conversion B to achieve higher effciency C to save copper D to reduce harmonics

1953


how the works electronic energy meter?

1763


why capacitive load is not used in routine life????any reason is there ??????

1241






how we design a pannel to start 10HP motor with the help of star delta starter?

1836


PLZ sent the previous year question paper for GET in NHPC on my EMail id ppshanker@gmail.com

5083


Where can I get CPWD electrical specifications & Shedule of rates? Please help me

1902


Z transform is use when system is not a) converges b) diverges

1282


I am interested to know what does 15 KVA DG set actually means? If I dont know the DG rating, is it possible to identify KW by simply knowing the diesel consumption?

1713


there is an alternator 480 k.w, 400v,50hz, 4-wire running on load having leakage alternator body earthed current 38 A. is it within acceptable limit? if yes then give reference if no then how to bring within specified limit

1590


why moisture formation found in XLPE Armoured cable outer sheath

1424


How to calculate ant test the burden of Current transformer

2047


ht side line to earth voltage

1167


how much leakage current is allowed in MC61A L&T make relay?

3227