A IS TWICE AS GOOD A WORKMAN AS B AND TOGETHER THEY FINISH A
PIECE OF WORK IN 14 DAYS.THE NUMBER OF DAYS TAKEN BY A ALONE
TO FINISH THE WORK IS
1.11 2.21 3.28 4.42
Answer Posted / k.prakashchandra
Take 2 men for A. Then 3:14 :: 2 : ? ,14 x 3/2= 21 days
| Is This Answer Correct ? | 17 Yes | 4 No |
Post New Answer View All Answers
fuel-air ratio in a petrol engine fitted with suction carburettor,operating with dirty air filter as compared to clean filter will be
With a phasor diagram show the effect of increasing the field current of a generator supplying a constant real power and connected to a grid system.
When the relative speed between the magnetic fields of stator and rotor does is zero under steady state operation?
what a function diesel generetaor turbo charger & turbo charger is more heated explain reason ?
how i chosse capacitor bank if my energy meter is 48 kvr? tell me capacitor bank chossen formula?
CAN CU XLPE/PVC CABLE BE USED INPLACE OF LOW NOISE SCREENED CABLE? KINDLY GIVE REASONS
we have a 2.5hp Starite electric motor water pump,the elec motor burned out,we need to replace starting capacitor(old capacitor specs erased),what microfarad rating capacitor do we need? 110-125V
What is the difference between Encoder and Resolver?
What is the BS(British Standard)code for 11kv motor
in 6.6 kv vaccum circuit breaker vaccum bottole vaccum capacity ????
working principle of AC Servo Motor with its construction
Different types of relay fault which phase sequence??
What's mean HVF & HAF in Vacuum Circuit Breaker?
difference between power surge and switching transient
What are the significant parts of dc generator?