A IS TWICE AS GOOD A WORKMAN AS B AND TOGETHER THEY FINISH A
PIECE OF WORK IN 14 DAYS.THE NUMBER OF DAYS TAKEN BY A ALONE
TO FINISH THE WORK IS
1.11 2.21 3.28 4.42
Answer Posted / k.prakashchandra
Take 2 men for A. Then 3:14 :: 2 : ? ,14 x 3/2= 21 days
Is This Answer Correct ? | 17 Yes | 4 No |
Post New Answer View All Answers
what is mathed of check the D.C MOTOR 181 KW (ARMATURE AND FIELD) WHAT IS THE MATHED OF CHECK THE THYRISTOR MODULE (HIGH CURRENT)
explain the Trip supervision circuit
Scott connection is used for A 3-phase to 2-phase conversion B to achieve higher effciency C to save copper D to reduce harmonics
how the works electronic energy meter?
why capacitive load is not used in routine life????any reason is there ??????
how we design a pannel to start 10HP motor with the help of star delta starter?
PLZ sent the previous year question paper for GET in NHPC on my EMail id ppshanker@gmail.com
Where can I get CPWD electrical specifications & Shedule of rates? Please help me
Z transform is use when system is not a) converges b) diverges
I am interested to know what does 15 KVA DG set actually means? If I dont know the DG rating, is it possible to identify KW by simply knowing the diesel consumption?
there is an alternator 480 k.w, 400v,50hz, 4-wire running on load having leakage alternator body earthed current 38 A. is it within acceptable limit? if yes then give reference if no then how to bring within specified limit
why moisture formation found in XLPE Armoured cable outer sheath
How to calculate ant test the burden of Current transformer
ht side line to earth voltage
how much leakage current is allowed in MC61A L&T make relay?