difference b/w timer and counter
Answer / k.prakashchandra
Timer does count-down and counter count-up
| Is This Answer Correct ? | 0 Yes | 0 No |
Explain RYB?
hi, i have 3x200KVA and 2 x 80KVA UPS with battery bank of 150AH 68Nos. and 100AH 204Nos., i need to install AC either ductable or PAC type, so can you help me to calculate heat load and capacity of the AC to install.
i am iti student i have project to do. that IS 100MW 220\33KV SUBSTATION I WANT TO KNOW HOW TO START, LIKE CALCULATION, WHAT RATING OF CT,CVT, PT, ISOLATOR LIGHTING ARRESTER WAVE TRAP CIRCUIT BREAKER IN 22OKV SIDE, ALSO TO WARDS 33KV SIDE PLS HELP ME WITH THIS, THIS MY LIFE NOW, I KNOW AUTOCAD, I LIKE TO KNOW HOW TO CALCULATE ALL THE THINGS
What is the minimum value required for Neutral to Earth in UPS Panels
What is RTCC panel and why it is required
31 Answers RTCC, Tivoli Grand,
why there is a temperature rise at different metal to metal contact at cable lug??suppose cable is aluminium and the lug is copper,than why the temperature rise takes place??
Definition of grid?
7 Answers L&T, Pace Power Systems, Vijai Electricals,
what voltage generated earth tester meter when we testing the Earth point ?
how much GROUND & NEUTRAL VOLT maintain in data center.
how many mega ohms insullation of the cable can't be use when testing with megger tester for Low voltage cable 240V use?
how to calculate lighting for a room
AC covered area by ton calculation
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)