Contrete reaches its full strength in 28 days. Then, why
are we removing shutter in 7/ 14 days?
Answer Posted / mhbkpr
We cannot deshutter in all type of concrete works. for e.g
footing, plinth, beam sides like we can remove within this.
But roof slab likes we need provide back proping before
removing.
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon
If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in
How you can use different dimension tools in cad? What are the different dimensions available?
100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags
what is the productivity in aluminium shuttering per day
Where will be the maximum bending moment in a TEE Beam?
What are the benefits of rcc pipes over steel designed pipes?
a butt weld is specified by
What is oneside mat. And explain
explain what do you mean by the property development.
What is type failure of road surface? how to repair the failure of road surface?
use ofr concrete as per grade ?
A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?
how to calculate MR 9(derivation)
What is the strongest bridge for a school contest?