Contrete reaches its full strength in 28 days. Then, why
are we removing shutter in 7/ 14 days?
Answer Posted / mhbkpr
We cannot deshutter in all type of concrete works. for e.g
footing, plinth, beam sides like we can remove within this.
But roof slab likes we need provide back proping before
removing.
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
give me the rate analysis for Bituminous Macadam and SDBC
For what purpose bedding is used under storm water drains?
What is Grid floor and mention its advantages ?
Why was the empire state building made of steel?
What are the different methods for drawing an arc?
What are the different approaches in designing the floors of the service reservoirs?
can we use PPC for concrete wall, If yes, what is the concrete (PPC & OPC) grade for Non- load bearing concrete wall, load bearing concrete wall & for cellar retaining wall.
What is the tensile strength of wood?
What is kn measurement?
how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')
what does the track parameter mean in staad.pro?
How long does it take concrete to harden?
Rate analysis of Vitrified tile in cement mortor 1:3
Floor tile measurement? Wall to wall or skirting to skirting
What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?