Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Contrete reaches its full strength in 28 days. Then, why
are we removing shutter in 7/ 14 days?

Answer Posted / mhbkpr

We cannot deshutter in all type of concrete works. for e.g
footing, plinth, beam sides like we can remove within this.
But roof slab likes we need provide back proping before
removing.

Is This Answer Correct ?    3 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

give me the rate analysis for Bituminous Macadam and SDBC

7410


For what purpose bedding is used under storm water drains?

1104


What is Grid floor and mention its advantages ?

3241


Why was the empire state building made of steel?

1112


What are the different methods for drawing an arc?

1233


What are the different approaches in designing the floors of the service reservoirs?

1171


can we use PPC for concrete wall, If yes, what is the concrete (PPC & OPC) grade for Non- load bearing concrete wall, load bearing concrete wall & for cellar retaining wall.

1758


What is the tensile strength of wood?

1191


What is kn measurement?

1258


how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')

2637


what does the track parameter mean in staad.pro?

6066


How long does it take concrete to harden?

1157


Rate analysis of Vitrified tile in cement mortor 1:3

4481


Floor tile measurement? Wall to wall or skirting to skirting

1830


What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?

2718