Contrete reaches its full strength in 28 days. Then, why
are we removing shutter in 7/ 14 days?
Answer Posted / saif raza
As deshuttering period is desrcibe in IS code for diffrent
structural member.
for deshutering purpose minimum strength required is
between 65 to 75% & concrete gain more then 65% atseven
days so it is safe to remove.
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
How many litres of water used for curing of 1000sqft of slav
Define What is Civil Engineering?
What are some facts about concrete?
Why is concrete cube test carried out?
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.
how much area can be platered by a mason for exterior
what is the permanent solution applied for restoration of leaning tower of pisa?
In reclamation works what are the importance of geotextiles and sand?
how do you stabilize a waterlogged area in road construction
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
What is thumb rule for deep trench excavation
Formula for calculating the volume of bulb in underreamed pile
How much does it cost for a R.C.C cover slab of size (450mmX 600mmx 100mm) double rf net given in feets using hand mix concrete?
In few lines, please be elaborative on extras and talents that make you a potential candidate for the post:
WHAT IS THE MAIN DIFFERENCE B/W HIGHWAYS AND MOTERWAYS?