Contrete reaches its full strength in 28 days. Then, why
are we removing shutter in 7/ 14 days?
Answer Posted / v.kapil
Concrete get its 50 % strength in 3 days and 66.6% in 7 days
with OPC grade of cement, we designed our structure for
full load including of factor of safety but actually such
loads never come structure in its whole life span, only 40-
50% loads ware accoured during construction so we can
remove our form work after 7-10 days but after confirmation
of cube results of 7 days.
| Is This Answer Correct ? | 15 Yes | 0 No |
Post New Answer View All Answers
a) Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
how much repeitation for conventional and maivan formwork?
can we use PPC for concrete wall, If yes, what is the concrete (PPC & OPC) grade for Non- load bearing concrete wall, load bearing concrete wall & for cellar retaining wall.
Who built the sears tower?
detailed calculation of the amount of cement used?
how many kg cement & fine sand reqird in one sq meter 1:6 mortar ratio?
what is mean by c32/40s concrete class
1. For 10sq.m area(47 kg bitumen contain) of 45 mm thick bitumen mix layer..how much bitumen is required for 1600 sq.m and how much aggregate need for that ?? 2. And much tonnage of bitumen mix required for 10 sq.m area of 45 mm thick. Please give answer...
What is difference between code and standard and specification?
How many cement sand ballast in cc 1:4:8 40mm
How much does the leaning tower of pisa lean?
what is civil enginnering & what you need of this course?
Use of coping on terrace wall and in 4" wall is compulsory or not ?
i want texture painting pwd data