Contrete reaches its full strength in 28 days. Then, why
are we removing shutter in 7/ 14 days?
Answer Posted / v.kapil
Concrete get its 50 % strength in 3 days and 66.6% in 7 days
with OPC grade of cement, we designed our structure for
full load including of factor of safety but actually such
loads never come structure in its whole life span, only 40-
50% loads ware accoured during construction so we can
remove our form work after 7-10 days but after confirmation
of cube results of 7 days.
| Is This Answer Correct ? | 15 Yes | 0 No |
Post New Answer View All Answers
How to calculate sand , cement quantity for 23mm thk brick work(10x10)
What is critical path method (c.p.m)?
what is derating factor in cable? what does it mean if derating factor is high/low in terms of thermal resistivity of soil?
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
What is the difference between yeild strength and compressive strength of steel???
what is the Asfalt test?in road constraction..?
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)
What is pre-stressed concrete?
What are the disadvantages while using stone dust as filler in pavements?
How much material will consume for following specification water tank (9*7.5*6 feet)?
what are the challenges of being a team leader and a supervisor?
How you read 5x3x1 #4 @ 20" 0/C in steel structure?
why are you joining in this (applied post) job and your aim for this job
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting?
what is the coefficient for running feet to cft coversion both area and price