Contrete reaches its full strength in 28 days. Then, why
are we removing shutter in 7/ 14 days?
Answer Posted / ankit
concrete achive its full stenghth in 28 days.while minimum
strength accrd. IS CODE is 7day strngth.
in field where the cost of construction is low,
shuttering / formwork is many a times removed even after
two to three days.only intial strenght matters.
| Is This Answer Correct ? | 6 Yes | 8 No |
Post New Answer View All Answers
What is the absolute pressure scale?
Who built the sears tower?
pls tell me , what is the water content
How to decide/consider the grade of bitumen for dbm.
at what pressure ply-wood is obtained by gluing wooden sheets
All aptitude question of Bechtel
Can anybody explain with the help of sketeches that what are 2legged , four legged & 6legged stirrups and how to calculate cut length of diamond ring(stirrups)?
Why are the bolts that hold steel rails together in oval holes?
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)
What is Base Shear ?
How many pyramid in egypt?
I want to know about rolling margin of steel :- For eg. If 2nos. bundle of 8mm dia steel with17 rods each of length 12m comes to store. During testing of 1m rod of each bundle it was found that 1rod has weight .405kg/m while other has .385kg/m. Now what will happen in case of steel payment and measurement payment ? Regards,
what is the difference between replacement of cement by groundnut shell ash
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].