Answer / loganathan

M15, M20, M30-M120 are the grades of CONCRETE. M stands for Mix. The numbers after M represents the STRENGTH OF THE CONCRERTE attained after 28 days of curing. say if it is M20, then the strength of that particular concrete will be 20N/mm2 (Newton per square millimetre)......

Is This Answer Correct ?    19 Yes 0 No

What Is the meaning of M15 and M20..

Answer / balu

M refers to the Mix. The number followed after M refers to the Characterstic compressive strength obtained of concrete casted in 150 x 150 x 150 mm standard moulds after 28days. Ex. M15 is 15 N/Sq.mm is the Characterstic Compressive Strength after 28 days reqd.

Is This Answer Correct ?    5 Yes 0 No

What Is the meaning of M15 and M20..

Answer / ravitejan

M stands for Mix
number stands for the strength of concrete which will be attain after 28 days...
strength(n/mm2)

Is This Answer Correct ?    1 Yes 0 No

What Is the meaning of M15 and M20..

Answer / arun kandari

28 days of crushing strength of concrete cubes of 150*150*150mm in mPa is known grade of concrete
Exp- 15mPa. M15

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

Pl answer. when we deduct 2d for cutting length of 90deg bend, whats the method of booking measurements as per IS code? whether cutting Length to be booked or something else?

2 Answers   Chettinad,


For raft 3000mm thickness with T25150 mesh reinf in top and bottom what diameter can be used for chair to support mesh reinforcement

4 Answers  


Curing time for 1)R.C.C slab 2)B.W 3)Plastering

1 Answers   PCC,


for gravel roads in India to get 1feet height how much height we have to fill

0 Answers   Sunrise,


what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?

1 Answers  


what is modular brick and it size

1 Answers  


what cement consumction plaster 15mm think per sqmt 1:3&1:6 how much kg.

3 Answers  


how to find steel quantity

1 Answers  


Cemen-1 Fine agr.-2 Core agr.-3 calculate for per 100 qube feet (qubic feet wise)

2 Answers  


what will be the grade of concrete for PCC having ratio 1:4:8?

8 Answers   L&T, UIPL,


How many different between estimated quantity and practical work at site.

1 Answers  


which beam has more strength rectangular or circular

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)