What is the difference between shuttering

Answers were Sorted based on User's Feedback



What is the difference between shuttering..

Answer / biplab ghosh

shuttering means a shape made before pouring of concrete as
specific size and diamention. This shape is made by
plywood/plate and with proper support.
centring means supporting arrengment of roof slab from
bottom.

Is This Answer Correct ?    137 Yes 23 No

What is the difference between shuttering..

Answer / devi singh

Shuttering is the frame or base provided for RCC structure
while centering is the support for shuttering.

Is This Answer Correct ?    33 Yes 18 No

What is the difference between shuttering..

Answer / joy

shuttering means form work for concreting , and centering means proper positioning of reinforcement with shuttering.

Is This Answer Correct ?    24 Yes 15 No

What is the difference between shuttering..

Answer / sheik.s

Shuttering is the structure prepared by mostly wood or steel
for pouring of concrete. centring is vertical spports for
withstand that..

Is This Answer Correct ?    13 Yes 4 No

What is the difference between shuttering..

Answer / mohammad eqbal

The vertical form work is called shuttering,where as horizontal form work is called as centring.

Is This Answer Correct ?    40 Yes 36 No

What is the difference between shuttering..

Answer / rakesh pattnaik

In answer #6 I don't get the proper solution. As can i say it shuttering if someone is asking me for centring if there are no difference between these words ? My experience says centring is alignment of TMT iron bars to hold and grip the concrete , while shuttering is to keep it(concrete) in proper place as per our required design

Is This Answer Correct ?    5 Yes 3 No

What is the difference between shuttering..

Answer / shamshair ali

the temporary support provided to the form work for supporting component parts of an arch, dome or other roofing structure is called centering


the temporary support beneath and at the sides of precast or cast in-situ concrete work is called shuttering.

Is This Answer Correct ?    6 Yes 4 No

What is the difference between shuttering..

Answer / nitin lahane

Centering is define as a proper arrangement of the Shuttering for giving dimension to structure.

Is This Answer Correct ?    6 Yes 5 No

What is the difference between shuttering..

Answer / ashwini

In vertical member such as columns etc which are supported by the shuttering and the base of the beam etc are supported by centering.
The shuttering can be removed by two or three days but the centering can be removed by only as per the days of beam.

Is This Answer Correct ?    1 Yes 0 No

What is the difference between shuttering..

Answer / mukarram

I Think there is no Difference between the two.. both are
the same..


Formwork is the term given to either temporary or permanent

moulds into which concrete or similar materials are poured.

In the context of concrete construction, the falsework

supports the shuttering moulds.



and same for shuttering also...

Is This Answer Correct ?    12 Yes 12 No

Post New Answer

More Civil Engineering Interview Questions

how much quantity of sand,cement,reqired for 100sqft of wall construction. And how much quantity required for plastring

1 Answers   Jade Software, NSP, TCS,


How do you calculate the unit weight of concrete?

0 Answers  


how much weight of 20 mm aggregate in bras?

3 Answers  


Where is lap in top & bottom beam

1 Answers   Bucon Infratech,


HOW what is the procedure for using m 50 concrete in columns & M 30 concrete in beams & slabs .

0 Answers   DRDO,






what is formula to calculate compressive strength of concrete or procedure??

4 Answers  


Is there a necessity for providing expansion joints in long RCC structure(say a wall of a water retaining structure)- say approximately 50 metres in length and about 4 metres high? What will be the limitations?

2 Answers  


you are a civil engineering student so what you have done to improve your knowdge

8 Answers   Infosys,


What is the sugested procedure of water purification for public supply?

0 Answers  


curing of concrete why 7day's,14day's 21day's 28days

5 Answers   Gammon,


What is the functional difference between DOME and R.C.C., where purpose of both covering roof?

2 Answers  


Design a rectangular channel.

0 Answers   CSI, Engineers India Limited,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)