Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What is the difference between shuttering

Answers were Sorted based on User's Feedback



What is the difference between shuttering..

Answer / biplab ghosh

shuttering means a shape made before pouring of concrete as
specific size and diamention. This shape is made by
plywood/plate and with proper support.
centring means supporting arrengment of roof slab from
bottom.

Is This Answer Correct ?    137 Yes 23 No

What is the difference between shuttering..

Answer / devi singh

Shuttering is the frame or base provided for RCC structure
while centering is the support for shuttering.

Is This Answer Correct ?    33 Yes 18 No

What is the difference between shuttering..

Answer / joy

shuttering means form work for concreting , and centering means proper positioning of reinforcement with shuttering.

Is This Answer Correct ?    24 Yes 15 No

What is the difference between shuttering..

Answer / sheik.s

Shuttering is the structure prepared by mostly wood or steel
for pouring of concrete. centring is vertical spports for
withstand that..

Is This Answer Correct ?    13 Yes 4 No

What is the difference between shuttering..

Answer / mohammad eqbal

The vertical form work is called shuttering,where as horizontal form work is called as centring.

Is This Answer Correct ?    40 Yes 36 No

What is the difference between shuttering..

Answer / rakesh pattnaik

In answer #6 I don't get the proper solution. As can i say it shuttering if someone is asking me for centring if there are no difference between these words ? My experience says centring is alignment of TMT iron bars to hold and grip the concrete , while shuttering is to keep it(concrete) in proper place as per our required design

Is This Answer Correct ?    5 Yes 3 No

What is the difference between shuttering..

Answer / shamshair ali

the temporary support provided to the form work for supporting component parts of an arch, dome or other roofing structure is called centering


the temporary support beneath and at the sides of precast or cast in-situ concrete work is called shuttering.

Is This Answer Correct ?    6 Yes 4 No

What is the difference between shuttering..

Answer / nitin lahane

Centering is define as a proper arrangement of the Shuttering for giving dimension to structure.

Is This Answer Correct ?    6 Yes 5 No

What is the difference between shuttering..

Answer / ashwini

In vertical member such as columns etc which are supported by the shuttering and the base of the beam etc are supported by centering.
The shuttering can be removed by two or three days but the centering can be removed by only as per the days of beam.

Is This Answer Correct ?    1 Yes 0 No

What is the difference between shuttering..

Answer / mukarram

I Think there is no Difference between the two.. both are
the same..


Formwork is the term given to either temporary or permanent

moulds into which concrete or similar materials are poured.

In the context of concrete construction, the falsework

supports the shuttering moulds.



and same for shuttering also...

Is This Answer Correct ?    12 Yes 12 No

Post New Answer

More Civil Engineering Interview Questions

What does 'M' stands for in M24 bolt ?

2 Answers   Rites,


what is steel consumption for high rise building column, beam, slab,footing

5 Answers  


1 m^ 3 of concrete 150 x150 mm of spacing of required of steel ?

2 Answers   HSCL,


what is the bearing capacity of hard rock

7 Answers  


what is lap length?

8 Answers   CCCL,


What are the reasons for geotechnical site investigations in uganda?

0 Answers  


Hi is it any equation or relationship that describe the stress-strain diagram in concrete deep beam?

1 Answers  


who to calculate the bar bending schedule?

3 Answers   APPSC,


what is the price of a cubic meter of concrete on international market?

0 Answers  


08. 4 main points about check list for Shuttering works are––– 4 i) ii) iii) iv) 09. 4 main points about check list for Concreting works are––– 4 i) ii) iii) iv) 10. 4 main points about check list for Plaster works are––– 4 i) ii) iii) iv) 11. 4 main points about check list for Brick works are–– – 4 i) ii) iii) iv) 12. 3 main points about Project delaying factors are––– 3 i) ii) iii) 13. Write down 60-grade M.S. deformed bar specification. 3 14. 3000 psi concrete means: 1 15. 4 main points about methods of wastage control are–– – 4 i) ii) iii) iv) 16. 1 main point about reasons for your honesty is : 1 17. Water cement mixing in hopper less mixture machine is better than hopper mixture machine because: 1 18. 2 main points about your role during roof casting are–––– 2 i) ii) 19. a. The weight of 3333m deform bar of 24.5 mm dia is…… 1 b. The weight of 300 rft plain bar of dia 1&#61618; is……. 1 20. The types of slumps are––– 3 i) ii) iii) 21. 4 main points about the causes of cylinder failure are––– 2 i) ii) iii) iv) 22. Detection of a beam & a girder are–––– 2 i) ii) 23. Curing is needed for–––– 1 24. The types of slabs in respect of size & shape are––– 5 In respect of size: i) ii) In respect of Shape i) ii) iii) 25. The types of Column in respect of size & shape are–– – 9 In respect of size: i) ii) In respect of Shape: i) ii) iii) iv) v) vi) vii) 26. 3 field tests & 3 Laboratory tests of bricks are––– 6 Field tests: i) ii) iii) Lab test: i) ii) iii) 27. 2 field tests & 1 Laboratory tests of sand are––– 3 Field tests: i) ii) Lab test: i) 28. 1 field tests & 1 Laboratory tests of M.S rod are––– 2 Field tests: i) Lab test: i) 29. a. The % of water absorbs by brick chips: …………… 1 b. The % of water absorbs by Stone chips: …………… 1 30. In respect of design: 5 a. The % of strength gains by concrete in 28 days= b. The % of strength gains by concrete in 14 days= c. The % of strength gains by concrete in 07 days= d. The % of strength gains by concrete in 03 days= e. The % of strength gains by concrete in 28 days without curing =

3 Answers  


what opc & ppc cement $ composition?

1 Answers  


how many type of admixtures for water stored structure?

0 Answers   IVRCL,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)