Answer Posted / ashwini
In vertical member such as columns etc which are supported by the shuttering and the base of the beam etc are supported by centering.
The shuttering can be removed by two or three days but the centering can be removed by only as per the days of beam.
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
what is called the inverd level of mabhole chamber?
yasser arfatcompleted his degree in civil from which university
Can anybody help by describing each and every step in short, used while giving a building layout by total station? Regards
Explain major difference between auto level and dumpy level?
how much brick, cement, and sand required in 1mtr X 0.23mtr X 1mtr brickwork(1:4), 230mm thick wall and 10mm thick mortar , brick size 230mm X 70mm X 110mm
Journal entry Gross salary 10000 Tax 1000 Employee contribution 2000 Employer contribution 2000
Why was the empire state building made of steel?
What is the maximum crushing load in Kg & crushing strength in N/mm2 for M25 & M 15 Grade concrete
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
What will be weight of 0.5mm GI sheet per sq.ft?
what is the breaking strength of wall tiles
Difference between lime, distemper and plastic emulsion?
Why joints are provided?
Please tell me the quantity of cement, sand, flyash, foaming agent required for 1 cubic meter of cellular lightweight concrete blocks. also , is there any admixtures required for the CLC blocks production.