Answer Posted / ashwini
In vertical member such as columns etc which are supported by the shuttering and the base of the beam etc are supported by centering.
The shuttering can be removed by two or three days but the centering can be removed by only as per the days of beam.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
why does the most of civil engg is not intersted to going for teaching field?
What is the procedure of concealed plumbing in toilets?
Why are separation membranes used between concrete pavement slab and sub-base?
Formula for calculation volume of essentric footing
In block work seawalls what is the purpose of slip joints?
1) What is meant by C-soil in geotechnical Engineering? 2) What is Eve board? 3) What will happen when heat is applied to cement? 4) what do you understand by the lateral dimention ?
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.
Questions related to civil.engg in company
how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
Whats the meanig of ,'K' VALUE in the case of soil.....
can i get civil engineering test papers.......?????
Define What is the tallest man made structure in the world?
What are new methods /technologies of pothole patching?
what is the use of beam end forces while using a staad ? wha they are show