what is the percentage of binding wire required for 1 mt of
steel binding in gerally
Answers were Sorted based on User's Feedback
Answer / satya.mvvs
In bridges wastage is very less, so 8 to 9Kgs (.8% to .9%)
may be preferred.
| Is This Answer Correct ? | 1 Yes | 1 No |
Answer / babu lal nayak
thumb rool is 3 kg. bracing wires requre for 100 kg. steel.....
| Is This Answer Correct ? | 0 Yes | 1 No |
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need
1 m^ 3 of concrete 150 x150 mm of spacing of required of steel ?
what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?
What is the roll of face bars in beams
pls tell estimate for 1 kilometre length random rubble masonry 0.90 metre height 0.600 metre width
What is passive earth pressure ?
how we can calaculate cutting lengh for stiruups 6mm dia . column size 20 cm x 30 cm, cover 20mm
For 12mm thick and cement plastering 1:6 on 100sqm new Brick work the quantity of cement required is
what is the bearing capacity of hard rock
Explain what is zoning permit?
deshuttering time for RCC for DPC over the foundation.
what are the differences between shear wall and column
4 Answers BM, L&T, University of Gondar,
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)