Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the difference between shuttering

Answer Posted / mohammad eqbal

The vertical form work is called shuttering,where as horizontal form work is called as centring.

Is This Answer Correct ?    40 Yes 36 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

any book or article on pumped concrete.

2208


States some of the commonly used commands in cad software’s?

1219


Permissible wastage of cement as per IS code ? In which IS code I get it?

1777


In cement concrete how to check a quality of material also proportion of material at site ?

1859


Formula of area of crane hook

2021


what is the cost differene of a same structure when it is constructed with brick masonary, and when it is constructed with concrete as a frame structure.????????

1939


what is the mix design for M:60 with micro silica andmetakaoline?

2256


Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?

2116


Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.

1753


quantity of material needed for rubble stone masonry for 1:4 and 1:6

1838


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

2860


What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...

1977


Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)

5055


In csae of hume pipes NP stands for Non Pressure bur what does it really mean?

2327


insted of bentonite we can use any alternate material in piling ?