Answer Posted / mohammad eqbal
The vertical form work is called shuttering,where as horizontal form work is called as centring.
| Is This Answer Correct ? | 40 Yes | 36 No |
Post New Answer View All Answers
any book or article on pumped concrete.
States some of the commonly used commands in cad software’s?
Permissible wastage of cement as per IS code ? In which IS code I get it?
In cement concrete how to check a quality of material also proportion of material at site ?
Formula of area of crane hook
what is the cost differene of a same structure when it is constructed with brick masonary, and when it is constructed with concrete as a frame structure.????????
what is the mix design for M:60 with micro silica andmetakaoline?
Does degree of bend of rebars has any effect on strength of the member? For example- if a beam is designed with 45 degree bent up bar with respect to architechtural needs and is not 45 in practical so will there be any reduction in the strength of member?
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
quantity of material needed for rubble stone masonry for 1:4 and 1:6
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...
Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)
In csae of hume pipes NP stands for Non Pressure bur what does it really mean?
insted of bentonite we can use any alternate material in piling ?