Answer Posted / mohammad eqbal
The vertical form work is called shuttering,where as horizontal form work is called as centring.
| Is This Answer Correct ? | 40 Yes | 36 No |
Post New Answer View All Answers
how much cement and sand required for 1cum rr masonry
at which depth the construction of tunnel is economical from cost and engineering aspect.
Material calculation of cm 1:6 for 1sqm
How is calculate the cube molt
What is zoning permit?
What are the methods of measurement? Describe it shortly
How much cement and sand required for 9"brick wall per square metre
IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI
In csae of hume pipes NP stands for Non Pressure bur what does it really mean?
Define angular dimension?
Why we provide hair pin for shed
I need old MMUP exam question and answer for Civil engineering
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
Which stone is best for wall construction Laterite Stone or Cement Blocks
what is pile and deam foundation