Answer Posted / shamshair ali
the temporary support provided to the form work for supporting component parts of an arch, dome or other roofing structure is called centering
the temporary support beneath and at the sides of precast or cast in-situ concrete work is called shuttering.
| Is This Answer Correct ? | 6 Yes | 4 No |
Post New Answer View All Answers
What things architect have to take care of before starting any project?
Why concrete barriers have curved surface profiles?
How do we determine the specific gravity of a cement?
What is need for setting limits?
why the profile of shell of natural draught cooling tower is hyperabolic.
Specific gravity of cement?
For the construction project what capital cost has to be taken in consideration?
What is dead load impact load live load
How to calculate Volume of Wet cement concrete for a specific grade?
How do you determine specific gravity of cement?
satart to end steps by step process of building construction...? i want to planning theme accuretly
what is tension & compression of steel bending.
One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?
as per is code, what is the minimum content of opc and ppc cement for rcc structure
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9