Answer Posted / mukarram
I Think there is no Difference between the two.. both are
the same..
Formwork is the term given to either temporary or permanent
moulds into which concrete or similar materials are poured.
In the context of concrete construction, the falsework
supports the shuttering moulds.
and same for shuttering also...
| Is This Answer Correct ? | 12 Yes | 12 No |
Post New Answer View All Answers
how to nfind out the specific gravity of sand.aggregate,water please help...
What is meaning of tlc
If specific gravity of cement is less than 3.15 what is the cause?
How to calculate brick work quantity?? Block work quantity??
Test procedure of fly ash bricks as per code ?
How much cement and water required for cement selery????
What happens to Load at yielding ?
I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?
The foundations are placed below ground level, to increase?
what is the basic difference between Coloumn & Shear Wall
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
What are the advantages of cad software?
resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil
Define different types of roof systems?
What is the Null Point of chimney in Power Plant