What is Replenishment lead time?
Answers were Sorted based on User's Feedback
Answer / rahu;
Total time for the in-house production or for the external
procurement of a product. In in-house production, the
replenishment lead time is determined to cover all BOM levels
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / mahendar
Replenishment Lead time is the time for material to become
available either from external procurement or in house
production.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / chitta
The time taken by the business to produce the material or
procure to make product available
Is This Answer Correct ? | 0 Yes | 0 No |
Answer /
It is a time taken process to make finished goods and dispatch
to the customer.
(Manufacturing time + Quality inspection time)
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / ashok reddy
It is the total time taken to manufactured the goods and make the goods ready for dispatch is known total replenishment lead time
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / dave
I have yet to see a correct answer. IT folks nearly always get it wrong. Some of the answers above are only correct in specific circumstances. People always miss the important of delivery/ship frequency. A transit and goods receipt time could be 7 days total. But if parts are being shipped from a supplier daily, the RLT for use in a formula, is 1 day. There will be 7 days of inventory in the pipeline. Not every material is Make to Order. It’s counter intuitive, but mostly just logic once understood.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / rajeshwaran
Its is the time taken to fill the the used stock. The fill
may be from supplier or through manufature
Is This Answer Correct ? | 3 Yes | 5 No |
Answer / mahesh
Srikanth is right..but If u r using Inhouse production time
then Planned delivery time is not applicable since planned
delivery time is used if u r procuring the material from
outside. We specify it as Procuremtn type in Material
Master.
Is This Answer Correct ? | 3 Yes | 9 No |
Answer / sailaja
Replenishment Lead Time is the difference between Stock
released from the picking location time - Stock replaced in
picking location time from stock reserved location time
Is This Answer Correct ? | 0 Yes | 8 No |
Is it possible to assign a material to more than one division?
1) What are the Stock transfer configuration steps ? 2) What is a function of account group except partner fuction creation ? 3) Tell me some critical Gaps(not basic one) which u faced in project and how u solved it ? 4) Tel me about u r bisiness flow and sales process ? 5) What is formula in pricing ? 6) What is a difference between Make to stock and Order to cash ?
Once you create a sales order, how do you confirm to the customer like I have the stock for ATP to check for the customer?
what is the purpose creating new pricing procedure instead of standard one?
Dears, while creating inquiry, i am getting error, "pricing error: mandatory condition PR00 is missing" please tell me how to solve this..
Explain in detail about the Pricing Reports you have generated for your client? Please provide detailed procedure for how to generate Pricing reports along with t- codes, detailed explanation with reference to your client examples. Plz provide answer to this question asap.... Waiting for your reply.... Thanks in advance.. Regards
10. What are the steps for end user training in sap SD module?
What is integration points between sd AND MM?
When we use Intercompany sales? The customer can directly go to the supplying company instead of his regular company.
Hi what is the difference between Enhancement and Exit. Thanks
Hi, My requirement is when we create an order with reference to quotation or contract (mainly) the quantity should not be changed in sales order.So i would like to know how to do these settings if i want to control these??? Its very urgent for me. Thanks in advance.
What is the break down in Pricing and Billing?