Answer / dandamudi tanuj
Min of 100kgs steel is assumed for 1 m3 of concrete. As per the standards of IS456-2000 unit weight of pcc is assumed as 2400 & unit weight of rcc is assumed as 2500. As per these standards assumption of steel per 1m3 of concrete should me minimum of 100kgs.
Is This Answer Correct ? | 1 Yes | 0 No |
Define What is the tensile strength of wood?
what is the maximum percentage of crush sand in mix design.also what is the difference betweeen grite powder & crush sand.
2 Answers TATA, Vastu Kirti Enterprises,
what is features of a typ-ical modern air-conditioning installation?
how can we design dia of rainwater pipes ? plez explain by using formula ?
Required amount of Steel bars, cement/ square feet for roofing of residential building upto 3rd floor.
how many kg of gypsum required for 100 sq.ft wall (thk of plaster is 12 mm)
1 Answers Indu Projects, Tata Tiscon,
Can anyone tell me the salary and job profile of transportation engineers/transport engineer?
What will be the maximum length of RCC Lintels?
Please tell me how many bricks needed for 4.5" bricks per m3(how to calculate this also), and outurn of mason. Thanks.
Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quantity of concrete by explaining all formulas involved.
16 Answers Reliance, Siddhi Constructions,
Rigid pavement Load in tyre preesure It Means KG
what is conventional shuttering rate per square feet of built up area? what is Mivan shuttering rate per square feet of built up area? what is coupler shuttering rate per square feet of built up area?