what is assumption consumption of steel per m3 for raft
Answers were Sorted based on User's Feedback
Answer / dandamudi tanuj
Min of 100kgs steel is assumed for 1 m3 of concrete. As per the standards of IS456-2000 unit weight of pcc is assumed as 2400 & unit weight of rcc is assumed as 2500. As per these standards assumption of steel per 1m3 of concrete should me minimum of 100kgs.
| Is This Answer Correct ? | 2 Yes | 0 No |
The name Taapsee Pannu is associated with which film A) baar baar Dekho B) freaky Ali C) Rustom D) pink
What is a projection line?
What is the Cement: sand: aggregate: water ratio for grade 30 (G30) concrete.
Steel Calculation for Footing, Beam & Columns?
what is the weight of wet concrete?
Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quantity of concrete by explaining all formulas involved.
16 Answers Reliance, Siddhi Constructions,
why & what is perchatage we are using fly ash in concrete?
What is the difference between built area and super built up area?
What is the accepted silt content in sand for concreting purpose by volume method?
230mm thick brick wall 10rmt length and 4.1 mtr high brick wall. tell quantity of cement,sand,brick required? Also tell me labour required to complete brickwall in 2days
why we used primmer in plumbing pipe??? and also what is SCH 80 AND SCH 40
Please tell me about surveying standard chain details.Thanks.
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)