How to calculate the Qty of Mortar in 1 m3 Brick work? Detailed Calculation Required?
Answers were Sorted based on User's Feedback
Answer / arun gandhamwar
01 cum wall = 500 No. Bricks with Mortar
size of Bricks with Mortar = 200 mm x 100 mm x 100 mm
With Mortar = 0.20 x 0.1 x 0.1
= 0.002 cum = 1.0 cum
Without Mortar = 0.19 x 0.09 x 0.09
= 0.00153 cum = 0.769 cum
Mortar Quantity = With Mortar - Without Mortar
= 1.0 - 0.769
= 0.231 Cum
| Is This Answer Correct ? | 4 Yes | 1 No |
Answer / santosh singh
quantity of dry cement mortar per cum = 0.35 m3
half brickwork per 100 sqm = 0.315 m3
| Is This Answer Correct ? | 2 Yes | 1 No |
Answer / syed azhar uddin
Size of brick is 10cm x 10cm x20cm
0.1x0.1x0.20=0.002cum.
1/0.002=500 no of bricks in 1 cum.
Cement mortor required for brick work .ratio is (1:5)
1) sand
1 cum=0.20 cum
0.20x actual quantity of brick work
0.20x1=0.20 cum.
2) cement
1 cum =(0.20x1440/5)
To find the value of cementfor 1cum theabove formula is necessary
0.20 refers to 1cum=0.20 of sand.
1440 refers to wt of cement per cum.
Where 5 refers last digit of cement mortor ratio.
1 cum = 57.6 kgs.
No of bags = 57.6/50 kg in one bag
=1.152 bags.
In one 1cum required
Cement: 1.152 bags.
Sand: 0.20 cum.
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / shivaji yadav
1m3 concrete=400bricks with mortar
2.54cm mortar layed on all sides of brick
assume 400 bricks placed in asingle row
mortar vol= [(400-1)x10cmx10cmx2.54]+[19x400x10cmx2.54cm]
=294386cm3
=0.2943m3
| Is This Answer Correct ? | 0 Yes | 3 No |
How do you derive the quantity of cement & sand in brick work construction in 1Meter cube, using CM 1:6 and bricks of size 19*9*9 cm
HOW TO CALCULATE REINFORCMENT IN STAIRCASE CRANKED BEAM
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?
How much overlaping required for welding the reinforcement bars in Columns & beams
How many kilograms of sand required in cufic feet for one cubic meter of M25 grade concrete
why in india readymade structure is impossible in residence houses?
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft
How do we test on design and style in a software?
In footing (mat) if two different dia of rods are to be used which rod should be placed at top and bottom ( eg. 10mm & 16mm dia rods)
why grading of cement is like 33,43,53?why not 25,35,45?
1 Answers Gokaraju Rangaraju Institute of Engineering and Technology GRIET,
What is the strongest bridge for a school contest?
why we leave expansion joint between to complex
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)