How to calculate the Qty of Mortar in 1 m3 Brick work? Detailed Calculation Required?
Answers were Sorted based on User's Feedback
Answer / arun gandhamwar
01 cum wall = 500 No. Bricks with Mortar
size of Bricks with Mortar = 200 mm x 100 mm x 100 mm
With Mortar = 0.20 x 0.1 x 0.1
= 0.002 cum = 1.0 cum
Without Mortar = 0.19 x 0.09 x 0.09
= 0.00153 cum = 0.769 cum
Mortar Quantity = With Mortar - Without Mortar
= 1.0 - 0.769
= 0.231 Cum
| Is This Answer Correct ? | 4 Yes | 1 No |
Answer / santosh singh
quantity of dry cement mortar per cum = 0.35 m3
half brickwork per 100 sqm = 0.315 m3
| Is This Answer Correct ? | 2 Yes | 1 No |
Answer / syed azhar uddin
Size of brick is 10cm x 10cm x20cm
0.1x0.1x0.20=0.002cum.
1/0.002=500 no of bricks in 1 cum.
Cement mortor required for brick work .ratio is (1:5)
1) sand
1 cum=0.20 cum
0.20x actual quantity of brick work
0.20x1=0.20 cum.
2) cement
1 cum =(0.20x1440/5)
To find the value of cementfor 1cum theabove formula is necessary
0.20 refers to 1cum=0.20 of sand.
1440 refers to wt of cement per cum.
Where 5 refers last digit of cement mortor ratio.
1 cum = 57.6 kgs.
No of bags = 57.6/50 kg in one bag
=1.152 bags.
In one 1cum required
Cement: 1.152 bags.
Sand: 0.20 cum.
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / shivaji yadav
1m3 concrete=400bricks with mortar
2.54cm mortar layed on all sides of brick
assume 400 bricks placed in asingle row
mortar vol= [(400-1)x10cmx10cmx2.54]+[19x400x10cmx2.54cm]
=294386cm3
=0.2943m3
| Is This Answer Correct ? | 0 Yes | 3 No |
How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?
How to find out slope footing concrete
0 Answers Ekta World, Punj Lloyd Ltd,
how to start basic designing in structure..procedure to knw basic start to do structural designs in civil field?
1 cum brick work CM1:6 how many bricks sand cement required brick size 8"4"3"
the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none
how to calculate 162/D2 FOR TMT
In earth work 1300 cum soil how to calculate how many liters require in water
what is the relation between seventh day strength & twenty eighth day strength of cement concrete
3 Answers KPSC Karnataka Public Service Corporation,
how to calculate stair case landing slab bottom shuttering marking,angle of stair case? top landing length-1250mm treads length-2700mm(9X300mm) rise length-1500mm(10X150mm top landing level +1.5m lvl bottom level-0.00m lvl
what is the density and bulk density of cement?
how to do rate analysis for P.C.C 1:4:8 for 2.83cum(100cft)
2 Answers Unity Infraprojects,
What do you meant by gui?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)