why the undervoltage relay's interlock is used in
earthswitch closing operation of the 400kV line scheme?
Answers were Sorted based on User's Feedback
to make sure ES can be closed only if line is dead, besides that in common practice, CB status is needed also as interlock Earthing switch
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / k.prakashchandra
So that the earth switch can not be closed with supply
| Is This Answer Correct ? | 1 Yes | 2 No |
What magnetic circuit is formed in berry-type constructions and why?
what type of loads are inductive load & resistive load ?how they different between each other ?
WHY DG are rated in KVA or MVA ???., but ALL power plants are rated in KW or MW.,,?
why insulators colour is BROWN?
How to increase the specific gravity of DG batteries?
why does in transformer the v/f ratio constant?
WHY LINK NOT A FUSE IN AC CIRCUIT
How to calculate HT XLPE CABLE for 11 kv / 433 v , 1500 kva oil type transformer system? plz provide step by step calculation
15 Answers Engineers India, Indian Railways, Polycab, Shashwat, Sitara Energy, Sonali Bank,
what are the types of basic earthing?and why we are doing that?
how water and air molecules are conduct the heat?
lamination figures
can we use ELCB and RCBO in one db
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)