how much cement,sand,aggregate will use for 1 cum in ratio of
1:2:4.

Answers were Sorted based on User's Feedback



how much cement,sand,aggregate will use for 1 cum in ratio of 1:2:4...

Answer / lakshmanarajan

The Ratio is 1:2:4 Total = 7

Ingredients of this Mixture is = 1.57

So the qty of Cement is = (1/7) x 1.57 = 0.224 cum

Volume of cement in i cum = 1440kg

therefore required cement = 1440 x 0.224 = 322.56kg

Weight of 1 cement bag is = 50 kg

so 322.56/50 = 6.45Bag

Add 5% for wastage = 6.45 x (5/100) = 6.77 bag required

Qty of Sand = (2/7) x 1.57 = 0.448 cum (1cum = 35.31 cuft)

convert cum to cuft = 0.448*35.31 = 15.18 cuft

Sand is available in unit,so 1 unit = 100 cuft

So required qty of sand is = 15.18/100 = 0.151 unit require

Qty of Aggregate = (4/7) x 1.57 = 0.89cum

Convert cum to cuft = 0.89 * 35.31 = 31.42cuft

sand & Aggregate also available in unit

so above the same as aggregate = 31.42/100 = 0.314 unit require

Is This Answer Correct ?    85 Yes 12 No

how much cement,sand,aggregate will use for 1 cum in ratio of 1:2:4...

Answer / nooorulhaq

need anwer

Is This Answer Correct ?    63 Yes 21 No

how much cement,sand,aggregate will use for 1 cum in ratio of 1:2:4...

Answer / roys

Ratio of concrete mix =1:2:4 (Calculation for 1cum)
Cement:-
1/7*1.54=.22 cum [1.54for dry volume]
=.22/0.0345
=6.38bags
Sand:-
2/7*.22=0.06cum
=0.06*35.32
=2.12cft
Aggregate:-
4/7*.22=0.13cum
=0.13*35.32
=4.59cft

Is This Answer Correct ?    61 Yes 24 No

how much cement,sand,aggregate will use for 1 cum in ratio of 1:2:4...

Answer / mr. b.nagaraj

as per is 6.4 bags of cement & 0.86m3 / 30.31cft of 20mm
aggregate & 0.46m3 / 16.25cft of sand requires for 1m3 of
m15 concrete or 1:2:4

Is This Answer Correct ?    46 Yes 21 No

how much cement,sand,aggregate will use for 1 cum in ratio of 1:2:4...

Answer / mukarram

R.C.C Ratio 1:2:4
0.92/4 x 28.80 = 6.624m3
wt of cement bag/m3 x 0.03472
1 x 0.0229 m3 cement
2 x 0.458 m3 Sand
4 x 0.916 m3 Concrete

50 x 0.0229 / 0.03472 = 329/50kg

6.59 No of Bag's

Is This Answer Correct ?    33 Yes 8 No

how much cement,sand,aggregate will use for 1 cum in ratio of 1:2:4...

Answer / javed ashraf

6.22 BAG OF CEMENT IN ONE CUBIC METER

.44 CUM FINE AGGREGATES

.88 CUM COARSE AGGREGATES

Is This Answer Correct ?    25 Yes 9 No

how much cement,sand,aggregate will use for 1 cum in ratio of 1:2:4...

Answer / prabakar

RCC 1:2:4 -density of cement=1440kg/m3 1m3 =1440/2=720*0.45
=324kg
=324/50=6.48bags
Sand=6.48*1.25
=8.0125cum
=2*8.0125
=16.025cum
Aggregate
=4*8.012
=32.05cum.

Is This Answer Correct ?    13 Yes 3 No

how much cement,sand,aggregate will use for 1 cum in ratio of 1:2:4...

Answer / zeshan

Simply for 1 cum of ratio 1:2:4
Concrete 1 cum
Sand 1/2 cum
Cement 1/4 cum

Is This Answer Correct ?    8 Yes 0 No

how much cement,sand,aggregate will use for 1 cum in ratio of 1:2:4...

Answer / er. syed layaq ali

practically Material Consumption in M15 1:2:4

Quantity-1 cum

Cement beg - 6 Nos(0.198 cum)

Coarse Sand - 0.396 Cum

Coarse Aggregate 0.792 Cum

Is This Answer Correct ?    7 Yes 5 No

how much cement,sand,aggregate will use for 1 cum in ratio of 1:2:4...

Answer / n. rajesh guttedar

Materials used for a 1 cum.in the ratio 1:2:4.


Cement. = 6.336 Bags.or ( 0.220 cum. )

Sand. = 0.440 cum.

Aggregate.= 0.879 Cum.

Is This Answer Correct ?    7 Yes 7 No

Post New Answer

More Civil Engineering Interview Questions

what is shear key and steel schedule?

2 Answers  


Explain what is Critical Path Method (C.P.M)?

0 Answers  


How to use of me trial wall plaster 6mm , 10mm par sqm. use in sand and cement ?

0 Answers   L&T,


how to calculate rate analysys of 1:6 plastering 10 sq m

0 Answers   DLF,


definition of compressive strength. definition of compressive stress.

1 Answers  






Q1) I am having an interview in a construction company for a large sewage project . Since I have not done any such project , there are some queries from my end. Pls. help me to solve them. I will be thankful to you :- a) Normally for large project 400-600 houses & around 1600 peoples , how much dia pipe is used and which type of pipe is used? b) For trenching , I have heard that IS 1200 implies, what are the rules of calculating earthwork in case of depth of 2m or above ? c) To prevent soil to fall when depth of trench is more , what steps are taken and how there qty. is calculated . Like I have heard about timbering . what is this ? d) What are the rules for disposing off the excavated soil ? e) How the pipes that are used are being jointed? f) In case of cleaning on choks , is there any intermediate things provided? g) For foul gases any outlets are provided thru out length of pipeline? h) What is the flow digram like from houses thru small pipe to main pipeline than where main pipeline disposes wastage ? i) Any other thing that has to be kept in mind while calculating earth work for excavation like steps are made and other things? How earthwork is calculated in case of steps ? Pls. explain with a sketch. Regards,

1 Answers  


Process of pcc in wateredug

0 Answers  


m15 screeding concrete ration calculation

0 Answers  


a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement

0 Answers  


difference between minor and major bridge.

5 Answers   Aecom, Bhel,


how many bricks are required for masonary trench having length of 31 mtr, depth of 0.6 mtr and breadth of 0.45 mtr on single brick work as well as double ( 9" ) brick work

5 Answers   IEC,


What is the difference between "working stress method" And "limit state method"?

12 Answers   Atkins, TCE,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)