how to design paver block
Procedure
1. Clean the site
2. Make level the site and provide slope in leveling to drain water
3. Fill the sand
4. Made correct with the first line and keep on laying
| Is This Answer Correct ? | 2 Yes | 1 No |
what do you mean by fe500d what is 500 n what's ,d,
how to cement bag calculate m25 grade
what is the formula for calculating concrete in circular column ? pls explain with diagram add a link for diagram
whats the concrete mix design ratio for M 35
1 Answers Rahman Industries, SPRRG,
what"s the formula to find the quantity (consumption) of cement,sand,aggregate for 1m3(1:2:4)?
11 Answers ABB, Construction, Isher, L&T, Saudi Oger, Spectra, Strati,
CROSS SLOPE OF Macadam Construction
why we put pocket in some structure instead of bolt.
what will happen if we use milk or oil in the place of water in concrete??????????
How do you compute volume of airflow?
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
how can we find out the ratio of cement and sand in plastering
how much deduction will be in 32 mm dia HYSD steel bar for 45 and 90 degree bend
0 Answers CDSIPL Centrodorstroy India Pvt Ltd,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)