Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how much cement,sand,aggregate will use for 1 cum in ratio of
1:2:4.

Answer Posted / mr. b.nagaraj

as per is 6.4 bags of cement & 0.86m3 / 30.31cft of 20mm
aggregate & 0.46m3 / 16.25cft of sand requires for 1m3 of
m15 concrete or 1:2:4

Is This Answer Correct ?    46 Yes 21 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

acceptance criteria for concrete works

2139


Define What is the origin of name Railway Sleepers?

1241


load combinations how many types for staad design purpose?

2111


Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?

1939


Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.

2176


During reclamation how can the occurrence of mud waves can be rectified?

1252


How to calculate Cement in bags ,sand in sqft and aggregate in sqft for 1cum M25 grade concrete

1698


what is difference between fluidity and workability also how palsticizer works

7371


The properties of concrete HA-30 and how does it differ with M 30 (specify the important characteristics like workability,strength,mix design,slump test value)and what is the standard relating to it

6069


what is the price of a cubic meter of concrete on international market?

1169


the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm

2305


Explain the latest method to detect a crack in a building?

1120


How do you compute moisture correction using the parameters gathered from Nuclear Density Gauge Apparatus and the moisture contents results from the lab.?

2216


i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr

1958


How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?

1767