how much cement,sand,aggregate will use for 1 cum in ratio of
1:2:4.
Answer Posted / n. rajesh guttedar
Materials used for a 1 cum.in the ratio 1:2:4.
Cement. = 6.336 Bags.or ( 0.220 cum. )
Sand. = 0.440 cum.
Aggregate.= 0.879 Cum.
| Is This Answer Correct ? | 7 Yes | 7 No |
Post New Answer View All Answers
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need
What tor stands for in tor steel?
16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.
how to calculate the strength of rebound hammer test reading in building construction ?
Plasterers do how many sqm with spray plaster machine? By hand one mason does 10m2/day. How much they do in Dubai with spray plaster machines?
Suppose you planning to paint newly fabricated workshop building made of structural steel of 10 tons total mass. How many litters paint primer for 1 coat and 2 coat of top coat?
What is capicity of cap lock scffolding stander(vertical member) and ledger of different size?
Explain the latest method to detect a crack in a building?
Which IS Code/American Code applied for coupler test of steel
Differentiate first angle & third angle projection?
What is the quantity of cement in mix m20 concrete?
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
Define What is unit weight of normal concrete?
I am in India. Employer A got approval for my H1. But they have no job for me now. Company B is going to file H1 for me. They do not know about company A. Is there any way that I get approved H1 of company A transferred to Company B?