how much cement,sand,aggregate will use for 1 cum in ratio of
1:2:4.
Answer Posted / zeshan
Simply for 1 cum of ratio 1:2:4
Concrete 1 cum
Sand 1/2 cum
Cement 1/4 cum
| Is This Answer Correct ? | 8 Yes | 0 No |
Post New Answer View All Answers
procedure for preliminary selection of size of column of 5 storey building
How much 1 cum of M15, M20 & M25 concrete weigh?
How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.
acceptance criteria for concrete works
Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
how clculate excavated or backfilling quantity by simpson's rule
What is the outturn of Ceiling plastering
In tower foundation, on the time of 3 mtr pit RCC casting if water and mud is their surface of PCC then what will be do?
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
how to caluclate sienerge qty in construction in ap
what is BPM in concrete demolition hammers. what is better a higher value or lower
What is the release of lien?
What is the Tor steel Consumption for residential building G+24 footing (thum rule) ?
what is the construction cost for per cft of multistorryed building in kolkata?