1 cubic meter contains how many bricks
Answers were Sorted based on User's Feedback
Answer / ziyahur rahuman
Answer is 500 bricks.
we know that.,
modern brick size 20x10x10cm.
0.2x0.1x0.1=0.002m3
for 1m3 = 1 divide by 0.002
= 500 bricks
| Is This Answer Correct ? | 46 Yes | 3 No |
Answer / m. ranjith kumar
The Standard size of brick is 190*90*90,
Volume of 1 brick=.19*.09*.09=.001539cu.m
No. on bricks per 1cu.m= 1/volume of 1 brick=1/.001539
= 649.77 (650nos)
| Is This Answer Correct ? | 96 Yes | 59 No |
Answer / santosh singh
hi,
friends you dont read books like B.N. DATTA OR CPWD
SPECIFICATIONS which states ie 1 cubic meter of brickwork
contains 500 bricks.please read. don't get confused.
1 cubic meter contains 500 bricks of size 20cm x 10cm x 10cm
this is standard.
which includes thickness of mortar ie. 10mm
(actual size of bricks is 19cmx9cmx9cm)
if size of brick varies then u can find it like this
no. of bricks = total volume of work/ volume of one brick
out total volume of brickwork 35% is volume/quantity of
mortar for 8 inch wall and for half brick wall volume of
mortar is 31.5 %.
ok
thank u .
| Is This Answer Correct ? | 29 Yes | 1 No |
Answer / m. karthikeyan
hi,
1 cubic meter contains 500 bricks of size 20cm x 10cm x 10cm
this is standard.
if size of brick varies then u can find it like this
no. of bricks = total volume of work/ volume of one brick
| Is This Answer Correct ? | 11 Yes | 1 No |
Answer / jamil ahmad
1 cubic meter approximately contain 500 bricks
| Is This Answer Correct ? | 12 Yes | 3 No |
Answer / raajesh kumar m.s
Normal brick size is 9"*4"*3"=0.0618cft
1cum=35.28cft
35.28/.0618=571No's......This is not with mortar
If in Mortar1:6 (9"wall)=408 Bricks
If in Mortar1:4 (for4"wall)=459No's
| Is This Answer Correct ? | 12 Yes | 5 No |
Answer / vijay ghotane
standard size of Brick - 19 cm x 9 cm x 9 cm
With motar it will be - 20 cm x 10 cm x 10 cm
1 cu meter / ( 0.2x0.1x0.1 )
= 500 no.s of bricks requied for 1 cu meter.
| Is This Answer Correct ? | 10 Yes | 3 No |
where the corner reinforcement be placed in the rigid road pavement? can it be placed below the bottom main bar of double netting pavement?
Steel Calculation for Footing, Beam & Columns?
What is the quantity of cement, sand, and gravel to be used in M20 grade of concrete for 1000 x 1000 x 1000 mm of sand (for cement please mention in kilos, and for sand and gravel please mention it in CFT)
In case of a beam ,main steel is provided along the longer span because, bending moment is directly proportional to length but why in case of one way slab main steel is provided along shorter span while as bending takes place along longer span?comment
what is called camber in the road ?
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.
what is the service corridor?
how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution
what is the meaning of W.T.S this is written on structural Drawing
how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?
What is the procedure of concealed plumbing in toilets?
What is green building?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)