Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

1 cubic meter contains how many bricks

Answer Posted / raajesh kumar m.s

Normal brick size is 9"*4"*3"=0.0618cft
1cum=35.28cft
35.28/.0618=571No's......This is not with mortar

If in Mortar1:6 (9"wall)=408 Bricks
If in Mortar1:4 (for4"wall)=459No's

Is This Answer Correct ?    12 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.

2728


how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour

1591


What is portland cement

8121


What in bending moment, if a moment is free end of cantilever beam?

1317


How to calculate 1 brss for RCC work  

2192


1.what is the mix proportion for cement soil compressed earth blocks? 2.how to calculate the mix proportion for cement stablised earth soil blocks?

2281


Define What materials were used to build the Golden Gate Bridge?

1132


Rate analysis of Vitrified tile in cement mortor 1:3

4490


How to calculate the force on a column of three story building. What should be the base concrete height?.

2231


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

2456


Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.

2548


asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream

1949


Define a polyline?

1251


what is the water-cement ratio of mix design while 30mpa in 7 days?

3068


Suppose you planning to paint newly fabricated workshop building made of structural steel of 10 tons total mass. How many litters paint primer for 1 coat and 2 coat of top coat?

3512