how can i calculate pcc and rcc cu.mtr rate? specify labor
and material cost should be diff
Answers were Sorted based on User's Feedback
Answer / hemant gaikar
Take length ,breadth and height of structure and multiply them then we met answer .always measurment taken in in m
| Is This Answer Correct ? | 0 Yes | 0 No |
what does '415' in FE415 stands for??
How to calculate brick work quantity?? Block work quantity??
What are the tests to be conducted on cement?
What is the per square fee cost of external development of a multistorey group housing project
what is the basic difference between Coloumn & Shear Wall
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.
What is the consumption of Brick in one meter cube both 6inch & 4inch thick
What are the various load combination in Limit state method?
2 Answers Developer Building Contracting, DMRC, Engineers India Limited,
what is difference between fe 415 and fe 500
11 Answers CCCL, ECC, Hariharan Foundations,
Please let me know the name of university which is offered distance education in BE or Btech in direct 3rd samester????
What is differnce between founadation & footin ?
How much quantity a carpenter can do in a day
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)