how many binding wire can be required for 1 metric tonne
steel?
Answers were Sorted based on User's Feedback
commonly required the quantitity of binding wires are about
10 to 11 kgs is sufficient in common practice
| Is This Answer Correct ? | 7 Yes | 18 No |
Answer / vikas dhanda
Approx 3.0 kg to 5.0 kg. binding wire required for 1 MT steel, depending upon spacing of steel
| Is This Answer Correct ? | 6 Yes | 20 No |
Answer / mohd parvez islam
1.5 kg binding wire required for 1 tonne steel
| Is This Answer Correct ? | 3 Yes | 24 No |
Answer / sjtbehera
binding wire calculation in sqm. it is appx. 2.7kg.sqm
| Is This Answer Correct ? | 7 Yes | 32 No |
Answer / ram
approximate 25 to 30kg binding wire required ti bind 1
metric tonne steel
| Is This Answer Correct ? | 1 Yes | 29 No |
Answer / manoj
Approx. 100kg of binding wire is required to bind 1 MT of
steel
| Is This Answer Correct ? | 4 Yes | 34 No |
what will happen if one could not properly follow the spacing of slab reinforcement bar?
0 Answers Yirgalem Construction,
How much cement ,steel bar, concrete ,required for 416 cum rcc slab
how to find quantity of total concrete, cement bags and sand. for any ratio
what is injection grouting and what is rewiring.
In Abutment walls (A1 side) why we are adopting fixed bearing (POT-PTFE)?
Q1) I am having an interview in a construction company for a large sewage project . Since I have not done any such project , there are some queries from my end. Pls. help me to solve them. I will be thankful to you :- a) Normally for large project 400-600 houses & around 1600 peoples , how much dia pipe is used and which type of pipe is used? b) For trenching , I have heard that IS 1200 implies, what are the rules of calculating earthwork in case of depth of 2m or above ? c) To prevent soil to fall when depth of trench is more , what steps are taken and how there qty. is calculated . Like I have heard about timbering . what is this ? d) What are the rules for disposing off the excavated soil ? e) How the pipes that are used are being jointed? f) In case of cleaning on choks , is there any intermediate things provided? g) For foul gases any outlets are provided thru out length of pipeline? h) What is the flow digram like from houses thru small pipe to main pipeline than where main pipeline disposes wastage ? i) Any other thing that has to be kept in mind while calculating earth work for excavation like steps are made and other things? How earthwork is calculated in case of steps ? Pls. explain with a sketch. Regards,
How is make concrete cube?
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?
How to calculate cut length of square shape stirrups?
what is the mean of opc cement and conceret grade 53 n?please explane with detail>
Why we are using coarse sand for brick work and is there any technical problem if, we use fine sand instead of coarse sand.
explain what do you mean by the property development.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)