how many binding wire can be required for 1 metric tonne
steel?
Answer Posted / ajay kumar roy
approx 6 to 8 kg requirement for 1mt
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
Why do we not deduct steel volume to find actual volume of concrete in practical as we have studied that,,, actual volume of concrete = volume of column- volume of steel pls explain with reference of IS code?????
in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?
Concrete cover for slab, column, beam and footing?
Formula for calculation volume of essentric footing
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
cause of cylinder test failure
What are the Types Of DPC and its Thickness used?
a sewer which receives the discharge of no. of house sewer is called house sewer lateral sewer intrcepting sewer sub-main sewer
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
i have to give lap joint fo 1Mtr steel of dia12mm,whenever i did mistake i cut less 5cm plz tell me how much i will give lap joint so that length comes 1Mtr
How to improve the strength of fly ash bricks to avoid corner damge? How to get the color lighter similar to normal concrete blocks/
Why the finite element method is lower bound solution?
How do you prepare Material Recovery Statement for deduction from contractors bills?
any book or article on pumped concrete.
What is quantity of cement and sand required for 2000sqft of tiling?