What is BOQ why to calculate BOQ

Answers were Sorted based on User's Feedback



What is BOQ why to calculate BOQ..

Answer / mohd hashiruddin

BOQ is defined as the bill of quantity 

in quantity surveying BOQ is prepared to show the cost of the material like no of cemnt bag, sand, brick,etc in a single sheet and sum is added to give the required rate for the various quantity

bill of quantity can be prepared separate for substructure and superstructure

Is This Answer Correct ?    12 Yes 2 No

What is BOQ why to calculate BOQ..

Answer / dhanraj

BOQ is defined as the bill of quantity

Is This Answer Correct ?    10 Yes 0 No

What is BOQ why to calculate BOQ..

Answer / b.nagaraju

BOQ -bill of quantity
Bow:- this purpose lot of use
1)required metrials
2) using materials
3)Balence of metrials
4)rates of market
5)monthly bills loss or profit.
All things are coming and project status.

Is This Answer Correct ?    0 Yes 0 No

What is BOQ why to calculate BOQ..

Answer / nafees

BOQ is basically we used for find out the quantity of materials whatw e used in constructions. like brickwork , cement, sand and RCC materials.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

List out the potential risk factors for workers on the construction site?

0 Answers  


Generally construction is based on which method:limit state of working stress

3 Answers   Mars Planning Engineering Services, Sterling Wilson,


Terms Name the bars which is used in beam and colume ? Like starter bar etc.

1 Answers  


What is the full form of BHEL? A) Bharat hydroelectricity Limited B) Bharat Heavy Electronics Limited C) Bharat Heavy Electricals Limited D) Bharat Heavy Enterprises Limited

1 Answers   HPSSSB,


please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering

0 Answers  






how i get all type of short type question answer about civil engg

0 Answers  


Define What is rigging?

0 Answers  


quick sand is a type of sand flow condition occuring in cohesive soil flow condition occuring in cohessionless soil all above

1 Answers  


What are the advantages of building a dam on the river nile?

0 Answers  


if cement is 70 kg. sand is 140 kg and coarse aggregate is 280 kg. so what is volume of cement, sand and coarse aggregate? please explane it.

3 Answers  


What is the ratio of cement,sand,aggregate of mix m25

9 Answers  


the shearing strength of cohesionless soil depends on

2 Answers   SSC,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)