What is BOQ why to calculate BOQ
Answers were Sorted based on User's Feedback
Answer / mohd hashiruddin
BOQ is defined as the bill of quantity
in quantity surveying BOQ is prepared to show the cost of the material like no of cemnt bag, sand, brick,etc in a single sheet and sum is added to give the required rate for the various quantity
bill of quantity can be prepared separate for substructure and superstructure
Is This Answer Correct ? | 12 Yes | 2 No |
Answer / b.nagaraju
BOQ -bill of quantity
Bow:- this purpose lot of use
1)required metrials
2) using materials
3)Balence of metrials
4)rates of market
5)monthly bills loss or profit.
All things are coming and project status.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / nafees
BOQ is basically we used for find out the quantity of materials whatw e used in constructions. like brickwork , cement, sand and RCC materials.
Is This Answer Correct ? | 0 Yes | 0 No |
List out the potential risk factors for workers on the construction site?
Generally construction is based on which method:limit state of working stress
3 Answers Mars Planning Engineering Services, Sterling Wilson,
Terms Name the bars which is used in beam and colume ? Like starter bar etc.
What is the full form of BHEL? A) Bharat hydroelectricity Limited B) Bharat Heavy Electronics Limited C) Bharat Heavy Electricals Limited D) Bharat Heavy Enterprises Limited
please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering
how i get all type of short type question answer about civil engg
Define What is rigging?
quick sand is a type of sand flow condition occuring in cohesive soil flow condition occuring in cohessionless soil all above
What are the advantages of building a dam on the river nile?
if cement is 70 kg. sand is 140 kg and coarse aggregate is 280 kg. so what is volume of cement, sand and coarse aggregate? please explane it.
What is the ratio of cement,sand,aggregate of mix m25
the shearing strength of cohesionless soil depends on