how many binding wire can be required for 1 metric tonne
steel?
Answer Posted / mohd parvez islam
1.5 kg binding wire required for 1 tonne steel
| Is This Answer Correct ? | 3 Yes | 24 No |
Post New Answer View All Answers
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals
Which tests are performed on soil to decide the type of foundation to be provided.
what is the minimum reinforcement provided in beams,footings,slabs? what is the minimum soil bearing capacity to design a multistorey building
what is features of a typ-ical modern air-conditioning installation?
Trapezoidal section footing calculation of Volume & its Area
For fine aggregate which is most suitable River sand or crusher sand & why ?
what is civil enginnering & what you need of this course?
why the openings of sieves are square io size?
how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6
Which is the direction for positive angle?
what is the list of building construction equipment & teir output?
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.
What is labor and material payment bond?
WHAT IS THE CAUSES OF RUTTING ON FLEXIBLE PAVEMENT?
what motivates you to do a good job