If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?
No Answer is Posted For this Question
Be the First to Post Answer
what is kribs is supporting?
What is the l/d ratio of cantilever beam?
Hi, Please tell me the ISI specification for the duration of concrete to achieve full strength of concrete. Is it 28days?
How calculate Load Bearing Capacity of Soil?
Rate analysis of Vitrified tile in cement mortor 1:3
0 Answers Design Space, Muthoot Group,
How much quantity of coping is done per day by one mason in Rmtr?
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
what is the basic fundamental of contouring?
what is the mode of method of face bar measurement
Which stone is best for wall construction Laterite Stone or Cement Blocks
How can we calculate the no.of bricks per sq.mr?
3 Answers GTL, Real, Sahyadri,
time and work questions