If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?
No Answer is Posted For this Question
Be the First to Post Answer
The concrete slump recommended for beams and slabs; is?
why we provide plastic sheet under lean concrete/pcc.?
how can we determine the quantity of steel bars in a structure? is there any formula for determing the number of bars required ?
how many bricks,cement,sand of a 40*30*6 ft bowndry wall?
6 Answers Natco, NGO, OGDCL, SIL, Simplex,
can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...
0 Answers Golden Bridge Contracting,
As per Method of measurement how to calculate no of column stirrups (ie: upto slab bottom or beam bottom)
What is minimum tensile strength required for structural steel works ?
How many days should curing of plastering, brick work and concrete
what is mean by c32/40s concrete class
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster
How to calculate cement required for m20,m5 grade
Is 456 revised lastly in which year? & What are the revisions?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)