Answer / viki

beam-25 mm or dia of bar(whichever greater)
column-40 mm or " " "
footing-50 mm or " " "

Is This Answer Correct ?    13 Yes 1 No

what is the cover for column,beam & footing?..

Answer / er shalu verma

for beam- 25 mm
column-40 mm
footing- 50mm

Is This Answer Correct ?    6 Yes 0 No

what is the cover for column,beam & footing?..

Answer / joseph

.Cover should be not less than the nominal value corresponding to the relevant environmental category plus any
allowance for loss of cover due to abrasion.
Refer BS 8110-1 clause 3.3.7
but for your basic info : cover to column and beam should not be less than 3cm and for footing it should not be less than 7.5cm (where soil in contact) and 5 cm (where there is no contact with soil ).
But please go through the soil investigation report for the precise value.

regards
joseph

Is This Answer Correct ?    5 Yes 0 No

what is the cover for column,beam & footing?..

Answer / dharmendra singh

column 40mm
beam 25mm
footing 50mm

Is This Answer Correct ?    1 Yes 0 No

what is the cover for column,beam & footing?..

Answer / vishal

50mm

Is This Answer Correct ?    1 Yes 0 No

what is the cover for column,beam & footing?..

Answer / aa

Beam=20mm,
Column=25mm,
fotting=40mm.

Is This Answer Correct ?    1 Yes 12 No

Post New Answer

More Civil Engineering Interview Questions

what is the quantity of cement bag we are use for (18'*9')wall?

1 Answers   Samprati Group,


Water cement mixing in hopper less mixture machine is better than hopper mixture machine because:

1 Answers  


what is the thickness mortar between two bricks

14 Answers   bscpl, L&T,


hi , can anybody help me about the following doubt...... what is the difference between clear cover, cover and nominal cover to reinforcement ?

3 Answers  


M.C.Q

3 Answers   Mitsui OSK Lines, TechInfini,






how to calculate reinforcment in staircase cranked beam?

0 Answers   DLF,


how cubic feet cement,sand,aggregate required for 1 cubic feet ratio=1,1.5,3

10 Answers   IBM,


What is the difference between Fe500 and Fe500D rebars in their appearance and also is there any change in their Yield Strength of these rebars?

1 Answers   Ripple India,


what opc & ppc cement $ composition?

1 Answers  


What materials were used to build the golden gate bridge?

0 Answers  


how much binding wire is required for one tone steel

20 Answers   Gammon, Hinduja, Jindal,


what are the standard & nominal size of brick

8 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)