how much of quantity of material required for execution of one cubic
meter of random rubble masonry in 1:3 cement mortar
No Answer is Posted For this Question
Be the First to Post Answer
in the footings first which reinforcement bar has to be layed as per desi
what is penetration test?why it is done?
in how much square meter of slab we are providing a beam it may be oneway or twoway slab.
if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????
Whr should a joint be located in a beam if the provision of a joint is unavoidable??
which type of materials should be used for framed structure???
What is water/cement ratio? Importance in construction?
for basic costing, how can we calculate how much amount of steel and cocrete will go in per sqft? and what are the thumbrules?
WHAT IS YOUR EXPECTED SALARY?
0 Answers ADITI, Allfon, Amazon, Ralph Lauren, Starbucks,
please send me bhel questions on rupesh.017@rediffmail.com
Will going from a 3-tap to 6-tap increase water pressure?
What is the difference between undo & redo?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)