Answer Posted / dharmendra singh
column 40mm
beam 25mm
footing 50mm
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How to find CN by using arcgis 9.3?
Why is the statue of liberty made of copper?
i) Distinguish between Theodolite and dumpy Level? (Marks-8) ii)Distinguish between Viscous and Turbulent flow? (Marks-8) iii) Distinguish between nominal and design mix? iv) What is standard sand? v) Explain the term plane stress? Vi) Differentiate between principal plane and principal axis? Vii) write short notes on Elastic limit of structural steel? viii) Write short notes on stress concentration? ix) write short notes on "Grading of Sand" ? x) How many grades of concrete are there under standard concrete?
manhole height is 1500 mm and width of brickwork is 230 mm dia of manhole covering is 560 mm brick masonry 1:4 horizontal length is 1500 mm and plaster 12 mm thick on both side 1:3. how to estimate the quantity of brickwork with mortar cement and sand for manhole chamber.
Use of coping on terrace wall and in 4" wall is compulsory or not ?
how to find ssm in foundation?
What are the different softwares used for cad?
Why Vitrified tile are getting pop up.
in a corner footing of a building, column lies in one corner. in this condition i want to know if the reactive pressure of soil will be uniformly distributed throughout the footing or will be uniformly varying as in the case of eccentrical loading.
cement required for construction of 400mm*200mm*200mm concrete solid blocks for 1sq.mtrs,how?
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
I want some common questions which have been asked in interviews of NTPC Limited,Satluj Jal Vidyut Nigam Ltd.,and Bharat Heavy Electricals Ltd.
Volume of 25kg putty bag & 40 kg putty bag volume??
how to calculate total cost for slab 35'×8'
What are some structures that may be subjected to fatigue?