what will be the quantity of following materials in P.C.C
for the total area of (100'x70'x 0'4")
1)NO. OF CEMENT BAGS
2)SAND IN CU.FT
3)METTLE IN CU.FT
No Answer is Posted For this Question
Be the First to Post Answer
what is the cover used for footings, columns, beams ??? why they differ & how they arrive??
what is the formula to calculate costing of rubble soling and wbm in road works?
how much distance to provide lap lengths in footings,plinth beams, columns, beams& slabs
what is the requierd compressive strenth for m 20 grade concreat for 7 days?
calculate qty of sand in 15 mm plaster for 100 sqm.
In a day One Mason can fix How many sqm of 60x60 tiles?
From where the relationship of target strength comes in mix design(graph)
how to calculate required shuttering material like props,spans,plates ..etc for a slab?
1 Answers NCC, Shoba Devlopers,
How many types of rcc slab
B.M DIAGRAMS & S.F DIAGRAMS OF CONTINOUS BEAMS
Wat is meant by Aecron brick?
how many cement bag in 1m*m*m
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)