As per the theory current doesn’t flows in Neutral, but practically it is not applicable, explain why?
2 5106What is the Frequency while we step up the voltage from 220V to 11KV? Is it possible? Explain it?
6 9819How to take the Vector Group Test in Transformer? What is the purpose of doing Vector Group Test?
3 7676Why do we generate 3 Phase AC Supply? It is possible to generate 4 Phase and 5 Phase explain it?
4 10226Post New Electrical Engineering Questions
why occ characteristics of generator is also called as magnatization characteristics ?
How will change the frequency in distribution side?
how harmonics generated in induction furnance? how minimise it?
Is it required to use Automatic transfer Switch in L&T panel board if we use AMF panel with DG set? How the single line diagram will be? Please forward the material to sreenu_207@yahoo.co.in
we have one oven for 12 zone we are installed ir lamp in oven we control load from thyrister and 0 to 5vdc so our zone no 8 getting bright in fraction of second so what we do.. Please answer
What is the complete procedure of erection of electrical panel in industry
what is the difference between skin effect
describe the phenomena of vacuum interruption in C.B
what are problems caused by the pdu in rack server
what is meant by CT`s saturation ? Can we use Metering CT`s with Protetection CT`s ?
It is desired to flood light the front of a building 42 meters wide and 16 meters hig.Projectors of 30 degree beam spread and 1000 watt lamps giving 20 lumen/watt are availabl.If the desired level of illumination is 75 lumen/m and show a suitable scheme.Assume the cofficient of utilization, deprecitation factor and waste light factor are 0.4, 13 and 1.2 respectively.
we have require a Motor (1500kW, 6.6kV, 50Hz) which shall operate at 1500rpm during 30min and after it shall run on 500rpm during 15min. The same cycle shall be repetitive during the whole working days. Which method is best and economic to achieve such type of task. VFD, VVFD, Pole changing motor etc.
how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING)IO (current operating)?
describe the A.C. Generator Testing procedure
how to i get B licence,i am completed BE electircal and electronics engineering.i want to konw the proceduure to get b licence