How to take the Vector Group Test in Transformer? What is
the purpose of doing Vector Group Test?

Answers were Sorted based on User's Feedback



How to take the Vector Group Test in Transformer? What is the purpose of doing Vector Group Test? ..

Answer / abhi

there are different arrangement for testing different vector group x mer's .The main purpose of testing is to avail that x mer's winding doesn't get damaged while transportation erection of x mer.

Is This Answer Correct ?    1 Yes 0 No

How to take the Vector Group Test in Transformer? What is the purpose of doing Vector Group Test? ..

Answer / nibel

the vector group of the transformer wil be seen in the name
plate. for example if its dyn11 means delta star with
neutral.11 means 11 o clock is the phase angle between
voltage and current(30 deg lead)

Is This Answer Correct ?    0 Yes 0 No

How to take the Vector Group Test in Transformer? What is the purpose of doing Vector Group Test? ..

Answer / arun

we can check the transformer vector group and polarity of
tansformer.ex.Dyn11 in name plate .11 "o" position we are
check th tansfomer

Is This Answer Correct ?    0 Yes 3 No

Post New Answer

More Electrical Engineering Interview Questions

what type of earthing do for dry fissure rock?

0 Answers  


Why we transmit the power at the voltage in the multiple of 11 or 1.1 like 11kv, 22kv, 66kv, 132kv...... some one told me that it is due to fomr factor 1.1 of sine wave. its fine but while transforming we can choose any voltage, so why only multiple of 1.1 there also.......? plz tell me.

7 Answers  


what is gas turbine intercooling ?

0 Answers  


explain the f=np/120 this equ.how to come 120

3 Answers   Jayaswal Neco Industries,


What is the use of core in the transformer?

19 Answers  






What is the Power factor of DC Power system ?

9 Answers  


Rated moter voltage and frequency is 380volt 60 hz but moter is running at 380votac 50hz is this harmful for moter winding

1 Answers   Infosys,


what is differentila pilot supervision in the incomer control panel in the power station?

0 Answers  


How to calculate the TR (AC's)

4 Answers  


wat is the role of reactive power in power generation?why we have maintain it.

3 Answers  


why humming sound occured in HT transmission lines.

9 Answers   GE,


is EEE eligible for getting electrical supervisor certificate ? if yes then from which state i sud apply

1 Answers   ONGC,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)