Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Civil Engineering Interview Questions
Questions Answers Views Company eMail

what is mix design?

2 5828

in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?

LOreal,

2349

what is main diffrence between vitrified and cremic tile????

Colliers International,

2 8051

what we execute firstly wall tile or floor tile?

Colliers International,

7 11291

what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.

Gammon,

2483

how to calculate the runner (2*3) qty in cft. the length is 8 feet.

CCCL, Gammon, Greenko, L&T,

6 53968

mean of NH4 pipe

GVK, L&T,

1 5611

Mean of m25 concrete

Artech, Dream Careers, KND Engineering, L&T, Trans Concrete,

8 32640

develpement lengh

Sobha Developers,

1 4790

lap lenth

5 9545

different type of beam

L&T,

6 11631

What is the difference between auto & dumpy level

L&T,

7 16947

we are roofing contractors,we are filling a bill in work contract 4.12% method, we collecting 4.12% from our customer but every month we have been paying the vat at 2% from our pocket on the total value of bill. our auditor told me the above method do not collect 2% from the customer side is it true?

1 3962

structural engineering based

HPCL, L&T,

4 8385

how to replace 8mm bar with 10mm bar if the the 8mm bar is not available..???

CICEF,

3 47478


Post New Civil Engineering Questions

Un-Answered Questions { Civil Engineering }

What is the quantity of cement used for stone pitching work of 100sqm 225mm thick and cement mortar of 1:6? And how?

5253


Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.

2218


What is a bearing capacity of soil?

1355


at which depth the construction of tunnel is economical from cost and engineering aspect.

1825


how much cement and sand required for 100sqm of wall plastering in different proportions

2448


If we are providing concrete joint in every 10m with water stopper in water tank wall then is it necessary to cut the steel at joint section?

1890


how to absorb to site basic corrections? which are the important correction?

1545


what will be the cost of thickness of 125mmor rcc measurement of 52x33.75 feet

1650


2nd and 4rt angle elevation used in which country ?

2318


Ratio for 4500 psi concrete

1700


I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.

2131


what pressure the NP2 class RCC pipe can sustain?

2759


20mm thick sand face plaster on walls consisting of 12 mm the backing coat of c.m.(1:3)and 8mm thick finished coat of c.m.(1:1)including scaffolding, watering, finishing etc complete please calculator with methyl et et r u

2416


How to calculate Volume of Wet cement concrete for a specific grade?

2324


If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)

2392