Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Civil Engineering Interview Questions
Questions Answers Views Company eMail

qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor

2249

how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building

2854

In two way slab where should we stop the work at end of the day?

2 6926

How will you provide reinforcement from corrosion?

2 4957

Water absorption for stone and first class stone bricks?

2 7818

Slump Values for works?

Aditya Constructions, SVS Constructions,

2209

why do we provide haunches in rcc box or underpasses?

3015

what is the mixing ratio of the cement mortar for tiles fixing in floor tiles?

NLC, Prakash Engineers,

5 22618

about 200 cubic mtr

2029

who to calculate the bar bending schedule?

APPSC,

3 7967

how many 1st class bricks in 1cu feet?

ECCI, Jayant Group, L&T,

28 137751

how to caculate cutting lenght in bar bending schedule for 180 degree bend

Bhel, L&T, NCC,

7 21487

how to calculate cutting length in bar bending schedule for 180 degree bend? for 90 degree bend we take 2d i.e we -2d for 180 degree ho much ? question asked at l&t

L&T,

2 8950

how to distinguish TMT n Tor steel?

2 6905

why you are selecting the civil engineering

gdcl, Sobha Developers,

4 9185


Post New Civil Engineering Questions

Un-Answered Questions { Civil Engineering }

the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm

2357


which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?

2082


How to find permissible diagonal tensile stress in reinforced brick work

2530


what is grade intersection?

2070


Rate analysis of 150mm, 100mm, & 230mm thk BBM work

8463


Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings

2146


Why concrete barriers have curved surface profiles?

1372


how to find hardness of water?why it should be determined?

2108


what will happen if one could not properly follow the spacing of slab reinforcement bar?

2053


how much cement sand n bricks required in im3?and how much in plaster?

2546


define the strength

2184


What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.

2101


five benefits of using standard terminology in the measurement process

3436


For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.

2051


How much cement and sand required for 9"brick wall per square metre

2920