Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379) explain why tap changer is always connected to high voltage winding side of the transformer.
10 44270sir, please send me the last three years exam papers conducted by CPCL- RECRUITMENT EXAM FOR Recruitment of Engineer ELECTRICAL ENGINEERING. A Soon as possible. i would be greatfull to u
1896Dear sir, In our plant have Station Transformer having capacity,i want to know, why LV side 40 - 40MVA is given? & how we can get 6.3 KV supply from tertiary(i.e. Open delta connection), Vector Group YNyn0 - yn0 +d MVA Rating 80MVA / 40 - 40MVA + 26.7MVA Voltage rating 420 (Tap range +6,to -10)81.25% /11.5KV - 11.5KV +6.3KV
Bhel,
2188Need help. 3 phase system. Neutral line arced and melted upon connection of connector with 3 phase power. Why would that happen?
4 6609please give me the syllabus and sample questions if possible for Instrumentation for Vizag Steel plant MT (Trainee) 2009 exam
1 7256i have seen one 8.4 MW synchronous motor in a plant located in bellary it is fixed with brushless rotary rectifier ,anybody can explain its start up principle
2000What is the maximun current carring capacity in per phase for three pole 100anps rating ncb
L&T,
3 8542I am having dual speed motor of cromton greaves make of 3.7 KW -1400 rpm and 5 KW - 900 rpm. Please let me know groups and winding connction for rewinding purpose.
1951what is the calculation method to design core and winding of a 200kva 3phase distribution transformer?
2419what are the effects on an power plant and consumers if the power factor is increased or decreased?
2 4753hai iam selected in po exam in allahabad bank . my interview date is 02-06-2009. so plese send me some sample question on my email. my email is nitinbikhani@yahoo.com
1968
Explain the difference between RAM and ROM? What is “Volatile Memory
What is the unit standard weight,thicknessof C.I>Pipe of various Dia upto200 MM(as per IS1538)
What will be advantage if we put some load in neutral of grounded star transformer & loadshortcircuit current,rated current of cable & MCB with example?
Why front wheel is bigger than rear wheel in tractor?
Why supercritical boilers use less amount of steel compared to non-supercritical boilers ?
how to calculate the step resistance for slipring induction motor,how you deside the no of step for that?
what do you mean by junk yard,neo,meo,leo in satellite communications
What is a bjt? What are its advantages and disadvantages?
I need control valve ISA hand book. Is there any site to download that big book containing all the pages. Written by Paul Friedmann
What is oneside mat. And explain
HOW CAN YOU RELATE THE FUNCTION WITH STRUCTURE EXPLAIN WITH APPROPRIATE EXAMPLES
I installed the smartplant instrument v8, but can not be opened, that always said: "INTools 2007 hardlock no found". So Could you help me how to do for that?
Preparation before arriving port?
Control cables in S's will carry 1000v which is AC R DC? Pls answer me
Draw the circuit of clapp oscillator?