Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...



Engineering Interview Questions
Questions Answers Views Company eMail

On what topic questions are asked?

2542

Yokogawa CENTUMVP R6.09 unable to download to Engineering Station with ExaOPC R3.75 The issue is when I try to download the common project section to the Engineering Station (STN) from the HIS in System View, it is unable to connect. The error displayed is: WARNING: Could not connect to equalize destination. (7001) Retrying. Number of retries = 0/1 ERROR: LdXopsLoadMain: connect error 10060 ERROR: Processing terminated due to connection error. (7002) Equalization end with errors. STN0149 ---- ERROR = 2 WARNING = 1 ---- Background: >Updated the ExaOPC software on the STN from 3.60 to 3.75 >STN operating system is Windows Server 2008 R2 >HIS operating system is Windows Server 2016 Stanard Solutions attempted include: >Ensuring all IP addresses are correct and all networked devices can be pinged. >The ability to ping a device using its host name from another device ( from HIS) >Ensure both devices firewalls are disabled. >The antivirus installed on the STN is disabled. >Ensuring both devices are within the same workgroup. >Added both devices to each other's Host and LMHost files. >Running IT Security tool after changing any administrative settings.

2192

how will you check torque value during Factory acceptance Test for control valve/ESD ON/OFF VALE how will you confirm this torque value is being correct, Which document will you be refer.

2483

how will you segregate the alarm levels in alarm management system during factory Acceptance Test

2386

Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon

2494

What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster

2304

Technical paper's of ECE

2276

Titan Mechanical Engineering Interview Questions

2358

i want to knowwhat kind of questions in interview in adnoc?

2147

Why not come out analog output in ABB EL3020 when display show correct value

1884

Can we use LT(150 sq. mm) cable in place of HT (120 sq.mm.) cable.?

1 2948

Corenuts technology interview questions

5749

DG cranking voltage?

4759

How much sand and cement requirement for 1 SQM 125mm thickness Brickwork

4497

What must be the distance between the Earth pit which are grounded from two different sources. Example: Distance between the earth pit for LV Panel-1 & 2

2076


Un-Answered Questions { Engineering }

how to check three phase motor torque value?

2371


How to calculate loses in transformer of 160 KVA ?

1662


physical identification of HT & LT panel

1675


Explain what are the skills required to become an architect?

1163


hello sir, i'm persuing my B.tech final year in textile chemistry and have a diploma in electronics and communication...interviewer ask why you should adopt textile chemistry from electronics and communication....please give me the best answer... thank you

1788


How do we arrive at selecting reactive capacitance value as 30% of h.p rating of motor?

1841


Why collector is made larger than emitter and base?

1017


give single line diagram of D.G distribution form alternator to main L.T panel?

7560


how strcpy usingrecursive function

2045


Define closed loop control system.

1085


sir,in our plant we r using SATEC PM172E power reading meeters in HT panel side it is monitoring the MB data smart viewer(sever).but last one week we did not get readings inthe server only available in meeter.tell me how communicate meter and server. and also what steps we take for checking.

2228


What do you mean by dyeing affinity?

1


Why let through energy not considered for ACB breaker while cable sizing?

2415


Its possible to use 3core 2R of 240 sq.mm cable for 3phases & separely 50sq.mm 3core cable fully for Neutral for connection of PCC to MCC 3ph..4wire system?

2097


how to calculate control valve bonnet size?? or how to select its material?

2437