Engineering AllOther (1379) A IS TWICE AS GOOD A WORKMAN AS B AND TOGETHER THEY FINISH A PIECE OF WORK IN 14 DAYS.THE NUMBER OF DAYS TAKEN BY A ALONE TO FINISH THE WORK IS 1.11 2.21 3.28 4.42
3 15164
dear friends pls explain me what is meant by positive seal in solenoid operated valve
hi friends kumar here if anybody of u have essar placement papers than plz send it to me i need it urgently..ok mail id is kskalyani@gmail.com
why the name trunking bus PT
Explain pH, Conductivity.
What is the minimum temperature for stress relieving of astm a 519 gr.4130 material and please tell us where we can find the location.
What was the spinning jenny?
i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
define displacement & magnitude ?
explain safety measures in alternator?
What is the effect of polarization of dielectric under heat?
HOW FORCE ACTING ON SPUR AND HELICAL GEAR
can u split the Point code switch(PC)
Which rocket led apple to space?
what is the significance of tan&delta and how it performed in power transformer
what is the use of Auto re-closer?